New dispatching rules for shop scheduling: a step forward

被引:100
作者
Jayamohan, MS [1 ]
Rajendran, C [1 ]
机构
[1] Indian Inst Technol, Dept Humanities & Social Sci, Ind Engn & Management Div, Madras 600036, Chennai, India
关键词
D O I
10.1080/002075400189301
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper provides a set of new dispatching rules for the minimization of various performance measures such as mean, maximum and variance of flow time and tardiness in dynamic shops. A static rule which minimizes the number of tardy jobs is also proposed. To evaluate these proposed rules, their relative performance is analysed in open job shops and reported in comparison with the standard benchmark rules such as the SPT (shortest process time) and EDD (earliest due-date), popular rules like ATC (apparent tardiness cost) and MOD (modified operational due-date), and the best performing rules in current literature such as RR, PT + WINQ, PT + WINQ + SL and AT-RPT. Thereafter, a comparative analysis of the relative performance of these rules is carried out in job shops (with no machine revisitation of jobs) and flow shops (with missing operations on jobs) in dynamic environments. Based on the simulation study and analysis of results in different manufacturing environments viz. job shops and flow shops, observations and conclusions are made, highlighting some interesting aspects about the effect of routeing on the individual performance of rules.
引用
收藏
页码:563 / 586
页数:24
相关论文
共 38 条
[11]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P123
[12]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[13]  
French S., 1982, Sequencing and Scheduling
[14]  
HAUPT R, 1989, OR SPEKTRUM, V11, P3
[15]   Efficient dispatching rules for scheduling in a job shop [J].
Holthaus, O ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (01) :87-105
[16]   COMPARATIVE PERFORMANCE ANALYSIS OF PRIORITY RULES IN A CONSTRAINED FLOW-SHOP WITH MULTIPLE PROCESSORS ENVIRONMENT [J].
HUNSUCKER, JL ;
SHAH, JR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :102-114
[17]   PERFORMANCE OF PRIORITY RULES IN A DUE DATE FLOW-SHOP [J].
HUNSUCKER, JL ;
SHAH, JR .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1992, 20 (01) :73-89
[18]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[19]   MODIFIED SIMULATED ANNEALING ALGORITHMS FOR THE FLOW-SHOP SEQUENCING PROBLEM [J].
ISHIBUCHI, H ;
MISAKI, S ;
TANAKA, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :388-398
[20]  
Jensen J. B., 1995, Journal of Operations Management, V13, P213, DOI 10.1016/0272-6963(95)00028-Q