Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling

被引:141
作者
Gao, K. Z. [1 ,2 ]
Suganthan, P. N. [1 ]
Pan, Q. K. [2 ]
Chua, T. J. [3 ]
Cai, T. X. [3 ]
Chong, C. S. [3 ]
机构
[1] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
[2] Liaocheng Univ, Comp Sch, Liaocheng 252000, Peoples R China
[3] Singapore Inst Mfg Technol, Singapore 638075, Singapore
基金
美国国家科学基金会;
关键词
Flexible job shop scheduling; Harmony search algorithm; Multi-objective optimization; Local search; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; FLOW-SHOP; SIMULATION;
D O I
10.1016/j.ins.2014.07.039
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes a Pareto-based grouping discrete harmony search algorithm (PGDHS) to solve the multi-objective flexible job shop scheduling problem (FJSP). Two objectives, namely the maximum completion time (makespan) and the mean of earliness and tardiness, are considered simultaneously. Firstly, two novel heuristics and several existing heuristics are employed to initialize the harmony memory. Secondly, multiple harmony generation strategies are proposed to improve the performance of harmony search algorithm. The operation sequence in a new harmony is produced based on the encoding method and the characteristics of FJSP. Thirdly, two local search methods based on critical path and due date are embedded to enhance the exploitation capability. Finally, extensive computational experiments are carried out using well-known benchmark instances. Three widely used performance measures, number of non-dominated solutions, diversification metric and quality metric, are employed to test the performance of PGDHS algorithm. Computational results and comparisons show the efficiency and effectiveness of the proposed PGDHS algorithm for solving multi-objective flexible job-shop scheduling problem. (C) 2014 Published by Elsevier Inc.
引用
收藏
页码:76 / 90
页数:15
相关论文
共 50 条
[31]   A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search [J].
Moslehi, Ghasem ;
Mahnam, Mehdi .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) :14-22
[32]   A Pareto-Based Discrete Harmony Search Algorithm for Bi-objective Reentrant Hybrid Flowshop Scheduling Problem [J].
Shen, Jingnan ;
Wang, Ling ;
Deng, Jin ;
Zheng, Xiaolong .
HARMONY SEARCH ALGORITHM, 2016, 382 :435-445
[33]   A Memetic Algorithm based on Immune Multi-objective Optimization for Flexible Job-shop Scheduling Problems [J].
Ma, Jingjing ;
Lei, Yu ;
Wang, Zhao ;
Jiao, Licheng ;
Liu, Ruochen .
2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, :58-65
[34]   Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling [J].
Zheng, You-lian ;
Li, Yuan-xiang ;
Lei, De-ming .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (9-12) :1063-1069
[35]   An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems [J].
Li, Jun-qing ;
Pan, Quan-ke ;
Liang, Yun-Chia .
COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) :647-662
[36]   A hybrid harmony search algorithm for the flexible job shop scheduling problem [J].
Yuan, Yuan ;
Xu, Hua ;
Yang, Jiadong .
APPLIED SOFT COMPUTING, 2013, 13 (07) :3259-3272
[37]   Path-relinking Tabu search for the multi-objective flexible job shop scheduling problem [J].
Jia, Shuai ;
Hu, Zhi-Hua .
COMPUTERS & OPERATIONS RESEARCH, 2014, 47 :11-26
[38]   A simulated multi-objective model for flexible job shop transportation scheduling [J].
Xu, Yiyi ;
Sahnoun, M'hammed ;
Ben Abdelaziz, Fouad ;
Baudry, David .
ANNALS OF OPERATIONS RESEARCH, 2022, 311 (02) :899-920
[39]   A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints [J].
S. Karthikeyan ;
P. Asokan ;
S. Nickolas .
The International Journal of Advanced Manufacturing Technology, 2014, 72 :1567-1579
[40]   Multi-objective flexible job shop scheduling of batch production [J].
School of Mechatronic Engineering, Jinling Institute of Technology, Nanjing 210001, China ;
不详 .
Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (08) :148-154