Simultaneous lotsizing and scheduling problems: a classification and review of models

被引:129
作者
Copil, Karina [1 ]
Woerbelauer, Martin [2 ]
Meyr, Herbert [2 ]
Tempelmeier, Horst [1 ]
机构
[1] Univ Cologne, Dept Supply Chain Management & Prod, Cologne, Germany
[2] Univ Hohenheim, Dept Supply Chain Management, Stuttgart, Germany
关键词
Dynamic lotsizing; Scheduling; Review; SEQUENCE-DEPENDENT SETUP; LOT-SIZING PROBLEMS; COMPRESSIBLE PROCESS TIMES; TRAVELING SALESMAN PROBLEM; CAPACITATED FLOW-SHOP; GENETIC ALGORITHM; PARALLEL MACHINES; INTEGRATED PRODUCTION; TABU SEARCH; UP TIMES;
D O I
10.1007/s00291-015-0429-4
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The current paper presents a structured overview over the literature on dynamic simultaneous lotsizing and scheduling problems. We introduce a classification scheme, review the historical development of research in this area and identify recent developments. The main contribution of the present review is the discussion of the historical development of the body of knowledge in the field of simultaneous lotsizing and scheduling and the identification of recent trends. This helps to reveal research opportunities, but it can also be helpful in the selection of appropriate models for industrial applications.
引用
收藏
页码:1 / 64
页数:64
相关论文
共 178 条
[1]   Production planning and scheduling in the glass container industry: A VNS approach [J].
Almada-Lobo, Bernardo ;
Oliveira, Jose F. ;
Carravilla, Maria Antonia .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (01) :363-375
[2]   Single machine multi-product capacitated lot sizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
Klabjan, Diego ;
Carravilla, Maria Antonia ;
Oliveira, Jose F. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (20) :4873-4894
[3]   Multiple machine continuous setup lotsizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
Klabjan, Diego ;
Carravilla, Maria Antonia ;
Oliveira, Jose F. .
COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2010, 47 (03) :529-552
[4]   Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
James, Ross J. W. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (03) :861-878
[5]   Lead time considerations for the multi-level capacitated lot-sizing problem [J].
Almeder, Christian ;
Klabjan, Diego ;
Traxler, Renate ;
Almada-Lobo, Bernardo .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 241 (03) :727-738
[6]   Synchronisation of scarce resources for a parallel machine lotsizing problem [J].
Almeder, Christian ;
Almada-Lobo, Bernardo .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (24) :7315-7335
[7]   Comparing models for lot-sizing and scheduling of single-stage continuous processes: Operations research and process systems engineering approaches [J].
Amorim, P. ;
Pinto-Varela, T. ;
Almada-Lobo, B. ;
Barbosa-Povoa, A. P. F. D. .
COMPUTERS & CHEMICAL ENGINEERING, 2013, 52 :177-192
[8]   Multi-objective integrated production and distribution planning of perishable products [J].
Amorim, P. ;
Guenther, H. -O ;
Almada-Lobo, B. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 138 (01) :89-101
[9]   Multi-Objective Lot-Sizing and Scheduling Dealing with Perishability Issues [J].
Amorim, Pedro ;
Antunes, Carlos H. ;
Almada-Lobo, Bernardo .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2011, 50 (06) :3371-3381
[10]  
[Anonymous], 2014, THESIS GEORGIA I TEC