Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis

被引:13
作者
Gelisen, Gokhan [1 ]
Griffis, F. H. [2 ]
机构
[1] Skanska USA Civil Northeast Inc, Queens, NY 11377 USA
[2] Polytech Inst New York, Ctr Construct Management Technol, Brooklyn, NY 11201 USA
关键词
Productivity; Stochastic processes; Simulation; Scheduling; Building information models; Time factors; Costs; Time-cost trade-off; Dynamic; Stochastic; Schedule; Animation; Building information modeling; BIM; 4-D; Cost and schedule; CONSTRUCTION; NETWORK; MODEL;
D O I
10.1061/(ASCE)CO.1943-7862.0000674
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Many studies of construction labor productivity are at a macro level. These macrolevel studies attempt to quantify the productivity or changes in productivity over the entire industry or a segment of the industry. This study is aimed at a micro or project level examination of productivity. The tool developed allows a company to predict, manage, and even optimize the productivity associated with a project or levels of projects. Automated productivity-based schedule animation (APBSA) is a dynamic scheduling methodology that stochastically utilizes weekly trended construction labor productivity data in order to automatically update the baseline schedule that was created at the beginning of the project by the construction manager. APBSA reports the construction activity duration variances and animates the progress of the job with most current data available in a four-dimensional (4D) environment. Contractors can improve their planning by utilizing APBSA with building information modeling (BIM) which will help them to improve their craft productivity. As a case study, a three-story Systems Engineering Facility III of Hanscom Air Force Base (AFB) was modeled. The model was developed in order to demonstrate the impacts of time and cost-based stochastic productivity indices on the baseline schedule. A time-cost trade-off analysis was also performed in order to show effects of duration variations on the cost of the project.
引用
收藏
页数:10
相关论文
共 50 条
[1]   Network decomposition-based benchmark results for the discrete time-cost tradeoff problem [J].
Akkan, C ;
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) :339-358
[2]  
ANG AHS, 1975, J ENG MECH DIV-ASCE, V101, P373
[3]  
[Anonymous], 2010, NEWTOWN CREEK WASTEW
[4]  
[Anonymous], 1974, The effect of temperature on productivity
[5]  
[Anonymous], 9036 PTI PENNS STAT
[6]  
[Anonymous], 9019 PTI PENNS STAT
[7]  
Bennett P. D., 1990, THESIS PENNSYLVANIA
[8]   THE TIME-COST TRADE-OFF ANALYSIS IN CONSTRUCTION PROJECT USING COMPUTER SIMULATION AND INTERACTIVE PROCEDURE [J].
Blaszczyk, Tomasz ;
Nowak, Maciej .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2009, 15 (04) :523-539
[9]   Integration of cost and schedule using extensive matrix method and spreadsheets [J].
Chen, Po-Han .
AUTOMATION IN CONSTRUCTION, 2008, 18 (01) :32-41
[10]   A time-cost trade-off model with resource consideration using genetic algorithm [J].
Chua, DKH ;
Chan, WT ;
Govindan, K .
CIVIL ENGINEERING SYSTEMS, 1997, 14 (04) :291-311