Progress of global ARAIM availability of BDS-2/BDS-3 with TGD and ISB

被引:3
|
作者
Ma, Xiaping [1 ,2 ]
He, Xiaoxing [3 ]
Yu, Kegen [4 ]
Montillet, Jean-Philippe [5 ]
Lu, Tieding [6 ]
Yan, Li [6 ]
Zhao, Lidu [7 ]
机构
[1] XiAn Univ Sci & Technol, Sch Geomat, Xian 710054, Peoples R China
[2] Shanghai Key Lab Space Nav & Positioning Tech, Shanghai 200030, Peoples R China
[3] Jiangxi Univ Sci & Technol, Sch Civil Engn & Surveying & Mapping Engn, Ganzhou 341000, Peoples R China
[4] China Univ Min & Technol, Sch Environm Sci & Spatial Informat, Xuzhou 221116, Jiangsu, Peoples R China
[5] Phys Meteorol Observatorium Davos, World Radiat Ctr PMOD WRC, Davos, Switzerland
[6] East China Univ Technol, Fac Geomat, Nanchang 330013, Jiangxi, Peoples R China
[7] Chongqing Jiaotong Univ, Sch Civil Engn, Chongqing 400074, Peoples R China
基金
中国国家自然科学基金;
关键词
ARAIM availability; TGD; ISB; MHSS; VPL; PERFORMANCE; RAIM; NAVIGATION; INTEGRITY;
D O I
10.1016/j.asr.2022.05.049
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Advanced RAIM (ARAIM) is an extension of Receiver Autonomous Integrity Monitoring (RAIM) by enhancing the vertical navigation capabilities, so it can be applied to higher-level precision applications. But when the observation data of the second-generation BDS (BDS-2) and the third-generation BDS (BDS-3) are combined to evaluate the ARAIM availability, the evaluation be affected by the Timing Group Delay (TGD) of different satellite signals and the Inter-system Bias (ISB) between BDS-2 and BDS-3, which is ignored by the existing literature. Therefore, in this article, we deduced the mathematical model of ARAIM and the calculation formula of Vertical Protection Level (VPL) by considering the combined influence of TGD and ISB. We used the BDS observation data and ephemeris files of 374 International GNSS Service (IGS) stations around world on July 29, 2021 to calculate the VPL of these stations and evaluate the global ARAIM availability. The results show that the number of visible BDS satellites is 8.033 and the Geometric Dilution of Precision (GDOP) is 1.721, which can meet the basic needs of global ARAIM calculations. Furthermore, when considering the combined influence of TGD and ISB, the evaluation of ARAIM availability by Multiple Hypothesis Solution Separation (MHSS) is significantly better than that without considering the combined TGD and ISB influence or their individual influence. The average VPL values at these IGS stations in four cases are 124.925 m, 13.882 m, 32.610 m and 9.962 m, and the corresponding ARAIM availability percentages are 90.839%, 95.241%, 96.751% and 99.660%, respectively. Finally, the minimum coverage of ARAIM availability based on BDS can reach 90.839%, which can meet the aviation demand for ARAIM availability in most regions and times. (c) 2022 COSPAR. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:935 / 946
页数:12
相关论文
共 50 条
  • [1] ARAIM Availability of BDS-2 and BDS-3 in the Global LPV-200 Approach
    Lihong Fan
    Tu R.
    Zhang R.
    Han J.
    Zhang P.
    Wang S.
    Hong J.
    Zhang S.
    Lu X.
    Gyroscopy and Navigation, 2022, 13 (04) : 294 - 303
  • [2] Apparent clock and TGD biases between BDS-2 and BDS-3
    Yize Zhang
    Nobuaki Kubo
    Junping Chen
    Feng-Yu Chu
    Ahao Wang
    Jiexian Wang
    GPS Solutions, 2020, 24
  • [3] Apparent clock and TGD biases between BDS-2 and BDS-3
    Zhang, Yize
    Kubo, Nobuaki
    Chen, Junping
    Chu, Feng-Yu
    Wang, Ahao
    Wang, Jiexian
    GPS SOLUTIONS, 2019, 24 (01)
  • [4] 顾及ISB参数的BDS-2/BDS-3精密单点定位性能分析
    任雨
    李军阔
    刘建
    李渊
    马聪
    大地测量与地球动力学, 2023, 43 (04) : 351 - 355+363
  • [5] Precise Orbit Determination of BDS-2 and BDS-3 Using SLR
    Yang, Honglei
    Xu, Tianhe
    Nie, Wenfeng
    Gao, Fan
    Guan, Meiqian
    REMOTE SENSING, 2019, 11 (23)
  • [6] ISB参数估计在BDS-2/BDS-3单点定位应用中的分析
    于海霞
    经纬天地, 2024, (03) : 11 - 15
  • [7] 顾及BDS-2/BDS-3间ISB的精密定位及时频传递性能评估
    堵晨曦
    王旭东
    谷玉宝
    廖振修
    合肥工业大学学报(自然科学版), 2024, 47 (09) : 1202 - 1212
  • [8] BDS-2/BDS-3三频PPP精度分析
    侯雪
    测绘与空间地理信息, 2022, 45 (09) : 169 - 171
  • [9] BDS-2/BDS-3短基线相对定位精度分析
    彭广民
    地矿测绘, 2021, 37 (01) : 8 - 12
  • [10] Preliminary analysis and evaluation of BDS-2/BDS-3 precise point positioning
    Chen, Hua
    Liu, Xuexi
    Jiang, Weiping
    Yuan, Peng
    Ju, Boxiao
    Chen, Yan
    ADVANCES IN SPACE RESEARCH, 2021, 68 (10) : 4113 - 4128