Building demolition waste management through smart BIM: A case study in Hong Kong

被引:57
作者
Kang, Kai [1 ]
Besklubova, Svetlana [1 ]
Dai, Yaqi [1 ]
Zhong, Ray Y. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Pok Fu Lam, Hong Kong, Peoples R China
关键词
Construction and demolition waste; Building demolition waste; Building information modeling; Internet of things; Digital twin; Waste minimization; Case study; CONSTRUCTION WASTE; QUANTIFICATION MODEL; LIFE-CYCLE; REUSE; GENERATION; INTERNET; SYSTEM; CHINA; REDUCTION; CONCRETE;
D O I
10.1016/j.wasman.2022.02.027
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Hong Kong's construction industry, known for its massive building infrastructure, produces an enormous amount of waste every year, the vast majority of which is disposed for landfills. Therefore, some effective operational measures and waste management policies have been implemented. However, enormous waste remains a concern for stakeholders and exert pressure on the limited capacity of Hong Kong's landfills. Though previous research discusses Building Information Modelling (BIM) application for construction waste management enhancement, the BIM model has not been widely implemented for building demolition with waste management. Hence, as a response to the aforementioned shortcomings, this paper develops a conceptual framework that allows collecting, maintaining, and analyzing comprehensive information through Smart BIM that uses advanced technologies such as Internet of Things (IoT) and capable of reacting to user activities such as waste quantitative assessment, demolition process planning, optimal disposal route selection, and waste management strategy are executed. The advantages of the proposed framework are shown in a case study benefit-cost analysis based on three planned reuse and recycling-rate scenarios that explain on-and off-site recycling methods. The results show that the proposed framework will pave the way for generating sustainable waste disposal practices by providing technical and decision-making support functionalities to engineers and planners in the construction industry.
引用
收藏
页码:69 / 83
页数:15
相关论文
共 109 条
[21]   Estimation of building-related construction and demolition waste in Shanghai [J].
Ding, Tao ;
Xiao, Jianzhuang .
WASTE MANAGEMENT, 2014, 34 (11) :2327-2334
[22]   A model for assessing the economic viability of construction and demolition waste recycling - the case of Ireland [J].
Duran, X ;
Lenihan, H ;
O'Regan, B .
RESOURCES CONSERVATION AND RECYCLING, 2006, 46 (03) :302-320
[23]   Automatic 3D Reconstruction from Multi-Date Satellite Images [J].
Facciolo, Gabriele ;
de Franchis, Carlo ;
Meinhardt-Llopis, Enric .
2017 IEEE CONFERENCE ON COMPUTER VISION AND PATTERN RECOGNITION WORKSHOPS (CVPRW), 2017, :1542-1551
[24]   Construction and demolition waste best management practice in Europe [J].
Galvez-Martos, Jose-Luis ;
Styles, David ;
Schoenberger, Harald ;
Zeschmar-Lahl, Barbara .
RESOURCES CONSERVATION AND RECYCLING, 2018, 136 :166-178
[25]  
Ge Xin Janet, 2017, Visualization in Engineering, V5, DOI 10.1186/s40327-017-0050-5
[26]   A method of landfill leachate management using internet of things for sustainable smart city development [J].
Gopikumar, S. ;
Raja, S. ;
Robinson, Y. Harold ;
Shanmuganathan, Vimal ;
Chang, Hangbae ;
Rho, Seungmin .
SUSTAINABLE CITIES AND SOCIETY, 2021, 66
[27]   Internet of things and Big Data as potential solutions to the problems in waste electrical and electronic equipment management: An exploratory study [J].
Gu, Fu ;
Ma, Buqing ;
Guo, Jianfeng ;
Summers, Peter A. ;
Hall, Philip .
WASTE MANAGEMENT, 2017, 68 :434-448
[28]   4D-BIM to enhance construction waste reuse and recycle planning: Case studies on concrete and drywall waste streams [J].
Guerra, Beatriz C. ;
Leite, Fernanda ;
Faust, Kasey M. .
WASTE MANAGEMENT, 2020, 116 :79-90
[29]   BIM-based automated construction waste estimation algorithms: The case of concrete and drywall waste streams [J].
Guerra, Beatriz C. ;
Bakchan, Amal ;
Leite, Fernanda ;
Faust, Kasey M. .
WASTE MANAGEMENT, 2019, 87 :825-832
[30]   Synchroperation in industry 4.0 manufacturing [J].
Guo, Daqiang ;
Li, Mingxing ;
Lyu, Zhongyuan ;
Kang, Kai ;
Wu, Wei ;
Zhong, Ray Y. ;
Huang, George Q. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 238