Multiple cross-docks scheduling using two meta-heuristic algorithms

被引:35
作者
Madani-Isfahani, Mansooreh [1 ]
Tavakkoli-Moghaddam, Reza [2 ,3 ]
Naderi, Bahman [4 ]
机构
[1] Islamic Azad Univ, Sch Ind Engn, South Tehran Branch, Tehran, Iran
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran 14174, Iran
[3] Univ Tehran, Coll Engn, Ctr Excellence Intelligence Based Expt Mech, Tehran 14174, Iran
[4] Univ Kharazmi, Fac Engn, Dept Ind Engn, Karaj, Iran
关键词
Multiple cross-docks scheduling; Simulated annealing; Firefly algorithm; Experimental design; TIME;
D O I
10.1016/j.cie.2014.05.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers a truck scheduling problem in a multiple cross docks while there is temporary storage in front of the shipping docks. Receiving and shipping trucks can intermittently move in and out of the docks during the time intervals between their task execution, in which trucks can enter to any of the cross docks. Thus, a mixed-integer programming (MIP) model for multiple cross docks scheduling is developed inspired by models in the body of the respective literature. Its objective is to minimize the total operation time or maximize the throughput of the cross-docking system. Moreover, additional concepts considered in the new method is multiple cross docks with a limited capacity. In this study, there are two types of delay times. The first type occurs when there is a shipping truck change and the second one occurs when the current shipping truck does not load any product from a certain receiving truck or temporary storage and waits until its needed products arrive at the shipping docks. To solve the developed model, two meta-heuristics, namely simulated annealing (SA) and firefly algorithms (FA), are proposed. In addition, a procedure for trucks scheduling in a state of a constant discrete firefly algorithm for the discrete adaptation has been proposed. The experimental design is carried out to tune the parameters of algorithms. Finally, the solutions obtained by the proposed SA and FA are compared. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:129 / 138
页数:10
相关论文
共 41 条
[1]   Heuristic solutions for transshipment problems in a multiple door cross docking warehouse [J].
Alpan, Guelguen ;
Ladier, Anne-Laure ;
Larbi, Rim ;
Penz, Bernard .
COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (02) :402-408
[2]   A bounded dynamic programming approach to schedule operations in a cross docking platform [J].
Alpan, Guelguen ;
Larbi, Rim ;
Penz, Bernard .
COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (03) :385-396
[3]  
[Anonymous], 2008, THESIS CHANGAN U
[4]  
Apte U.M., 2000, International Journal of Logistics Research and Applications, V3, P291, DOI [10.1080/713682769, DOI 10.1080/713682769]
[5]   Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage [J].
Arabani, A. R. Boloori ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (03) :1964-1979
[6]   The best shape for a crossdock [J].
Bartholdi, JJ ;
Gue, KR .
TRANSPORTATION SCIENCE, 2004, 38 (02) :235-244
[7]  
Cooke J.A., 1996, LOGISTICS MANAGEMENT, P47
[8]  
Cooke J.A., 1997, LOGISTICS MANAGEMENT, P56
[9]  
Donaldson H., 1999, 9904 GA
[10]  
Forger G., 1995, Modern material handling, V36, P36