Surface settlement of subway station construction using pile-beam-arch approach

被引:55
作者
Yu, Lin [1 ]
Zhang, Dingli [1 ]
Fang, Qian [1 ]
Cao, Liqiang [1 ]
Xu, Tong [1 ]
Li, Qianqian [2 ]
机构
[1] Beijing Jiaotong Univ, Minist Educ, Key Lab Urban Underground Engn, Beijing 100044, Peoples R China
[2] Beijing Urban Rapid Transit Dev Co Ltd, Beijing 100027, Peoples R China
关键词
Surface settlement; Subway station construction; Pile-beam-arch approach; Field monitoring; TUNNELS; PERFORMANCE; PROTECTION; PIPELINES;
D O I
10.1016/j.tust.2019.05.016
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper illustrates the surface settlement characteristics of subway station construction in the shallow-buried soft ground using the pile-beam-arch (PBA) approach of the shallow tunnelling method. The geological conditions, cross sections and measured surface settlements of 30 subway stations constructed by the PBA approach in Beijing are presented. The total surface settlements of the strip foundation station and the pile foundation station using the PBA approach mainly range from 40 mm to 80 mm and from 30 mm to 40 mm, respectively. The superposition of the surface settlements in Stage 1 and 3 of the PBA approach accounts for about 90% of the total surface settlement, and that in Stage 2 and 4 accounts for about 10%. The mean of the surface settlements produced in silty clay is smaller than that in silty sand, and is approximately 1.4 times as large as that in gravel. The surface settlement generally decreases with the increase of the overburden depth. The surface settlement could more than double due to the effect of groundwater. The surface settlement induced by the excavation of the latter level of drifts is commonly larger than that of the former level of drifts. In addition, the quality of workmanship has significant impacts on the surface settlement. This research is conducive to update the database of the world subway projects and can serve as a practical reference for future similar projects.
引用
收藏
页码:340 / 356
页数:17
相关论文
共 30 条
[21]   Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground [J].
Amiri, Sina ;
Dehghan, Ali Naghi .
FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2022, 16 (06) :704-717
[22]   Surface Settlement Induced by Subway Tunnel Construction Based on Modified Peck Formula [J].
Qianjin Zhang ;
Ke Wu ;
Shuaishuai Cui ;
Yalin Yu ;
Zheng Zhang ;
Jiahui Zhao .
Geotechnical and Geological Engineering, 2019, 37 :2823-2835
[23]   Surface Settlement Induced by Subway Tunnel Construction Based on Modified Peck Formula [J].
Zhang, Qianjin ;
Wu, Ke ;
Cui, Shuaishuai ;
Yu, Yalin ;
Zhang, Zheng ;
Zhao, Jiahui .
GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) :2823-2835
[24]   Pile and Concrete Arch Pre-supporting System (PCAPS) for Construction of Underground Subway Stations in Soft Grounds [J].
Parsapour, Davoud ;
Mohammadi, Dariush .
INDIAN GEOTECHNICAL JOURNAL, 2024, :1801-1829
[25]   Subway station construction using combined shield and shallow tunnelling method: Case study of Gaojiayuan station in Beijing [J].
Cao, Liqiang ;
Fang, Qian ;
Zhang, Dingli ;
Chen, Tielin .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 82 :627-635
[26]   Surface settlement and influence on Xi'an City Wall due to Xi'an Subway Line 2 tunnel construction [J].
Li, Junlian ;
Zheng, Jianguo ;
Yao, Yangping .
SUSTAINABLE DEVELOPMENT OF URBAN ENVIRONMENT AND BUILDING MATERIAL, PTS 1-4, 2012, 374-377 :2326-+
[27]   Study on ground settlement and structural deformation for large span subway station using a new pre-supporting system [J].
Jia, Pengjiao ;
Zhao, Wen ;
Du, Xi ;
Chen, Yang ;
Zhang, Chaozhe ;
Bai, Qian ;
Wang, Zhiguo .
ROYAL SOCIETY OPEN SCIENCE, 2019, 6 (02)
[28]   Estimating maximum surface settlement due to EPBM tunneling by Numerical-Intelligent approach - A case study: Tehran subway line 7 [J].
Moeinossadat, Sayed Rahim ;
Ahangari, Kaveh .
TRANSPORTATION GEOTECHNICS, 2019, 18 :92-102
[29]   Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure [J].
Kivi, A. Valizadeh ;
Sadaghiani, M. H. ;
Ahmadi, M. M. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 28 :1-9
[30]   Prediction of Surface Settlement in Shield-Tunneling Construction Process Using PCA-PSO-RVM Machine Learning [J].
Zhang, Yan ;
Wang, Zicheng ;
Kuang, Hewei ;
Fu, Feng ;
Yu, Aiping .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2023, 37 (03)