Study on Real-time Monitoring System of Mining Subsidence Area Based on LabVIEW

被引:0
作者
Guo Xing-qiang [1 ]
Qian Zhao-ming [1 ]
Ren Gao-feng [1 ]
Liu Zhi-gang [2 ]
机构
[1] Wuhan Univ Technol, Sch Resource & Environm Engn, Wuhan 430070, Peoples R China
[2] Henan Polytech univ, Key Lab Mine Informat, Jiaozuo, Peoples R China
来源
GREEN POWER, MATERIALS AND MANUFACTURING TECHNOLOGY AND APPLICATIONS III, PTS 1 AND 2 | 2014年 / 484-485卷
关键词
Mining Subsidence; Real-time Monitoring System; LabVIEW;
D O I
10.4028/www.scientific.net/AMM.484-485.303
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Taking the mining subsidence as research object, a real-time monitoring scheme was designed. On this basis, a virtual instrument monitoring system based on Lab VIEW was constructed. The data acquisition instrument collect real-time data through monitoring of subsidence and subsidence slope deformation by this system in range of mining influence, then control and transform it. After this, the data was transmitted to the computer terminal through wireless transmission equipment, and monitoring will be got after analysis and prediction by computer terminal. This result can provide mining of this area with real-time advice and guidance, to reduce the harms brought by mining subsidence and unnecessary economic losses.
引用
收藏
页码:303 / +
页数:2
相关论文
共 10 条
[1]  
Cao Liwen, 2002, J CHINA U MINING TEC, P26
[2]  
Gao Yongqin, 2013, COAL TECHNOLOGY CHAN, P124
[3]  
Hao Chuancai, 2010, GUANGZHOU ARCHITECTU, P33
[4]  
Li Chunlei, 2006, METAL MINE BEIJING, P53
[5]  
Li Jingtao, 2012, SHANGHAI URBAN PLANN, P112
[6]  
Navaee Shalmam, 2004, TECHNICAL OUTREACH C, P2211
[7]  
Song H., 2013, STUDY DISTRIBUTION C, P1
[8]  
Wang Jinzhuang, 2007, XIAM 7 NAT C MIN SUR, P25
[9]  
Yan Zhenxiong, 2012, STUDY MONITORING SYS, P4
[10]  
Zhao Likun, 2013, STUDY DEV AUTOMATIC, P35