Two-machine Flow Shop Scheduling with Re-entrance

被引:1
|
作者
Jing, Caixia [1 ]
Qian, Xingsan [1 ]
Tang, Guochun [2 ]
机构
[1] Shanghai Univ Sci & Technol, Coll Management, Shanghai 200093, Peoples R China
[2] Shanghai Second Polytech Univ, Inst Management, Shanghai 201209, Peoples R China
来源
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II | 2008年
基金
中国国家自然科学基金;
关键词
D O I
10.1109/ICIII.2008.81
中图分类号
F [经济];
学科分类号
02 ;
摘要
Re-entrant two machine flow shop scheduling problem with the objective of minimizing makespan is considered There are n jobs to be processed on two machines and each job has the processing route (M-1, M-2, M-1, M-2, ..., M-1, M-2). In contrast to the classical scheduling assumption that each job visits each machine at most once, in this re-entrant shop, jobs can visit certain machines more than once. The re-entrant characteristic makes the problem much more complicated and intractable. In this paper, the re-entrant problem can be transformed into a two-machine flow shop scheduling problem subject to parallel chain precedence constraints, which is equivalent to the single machine scheduling subject to precedence delays under some conditions. Based on the relationships explored for the three scheduling problems, polynomial algorithms are developed for some special cases of the re-entrant problem.
引用
收藏
页码:528 / +
页数:2
相关论文
共 50 条
  • [41] New results on two-machine flow-shop scheduling with rejection
    Zhang, Liqi
    Lu, Lingfa
    Li, Shisheng
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2016, 31 (04) : 1493 - 1504
  • [42] Two-machine flow shop scheduling integrated with preventive maintenance planning
    Wang, Shijin
    Liu, Ming
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2016, 47 (03) : 672 - 690
  • [43] Relocation Scheduling in a Two-Machine Flow Shop with Resource Recycling Operations
    Lo, Ting-Chun
    Lin, Bertrand M. T.
    MATHEMATICS, 2021, 9 (13)
  • [44] Two-machine flow shop scheduling with linear decreasing job deterioration
    Wang, Ji-Bo
    Liu, Li-Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) : 1487 - 1493
  • [45] Stochastic scheduling for a two-machine open shop
    Righter, R
    JOURNAL OF APPLIED PROBABILITY, 1997, 34 (03) : 733 - 744
  • [46] On two-machine stochastic flow shop
    Wermus, M
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1390 - 1392
  • [47] A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine
    Gara-Ali, Ahmed
    Espinouse, Marie-Laure
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 481 - 488
  • [48] Two-machine flow-shop scheduling problem with weighted WIP costs
    Yang, J
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 592 - 597
  • [49] Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints
    Zhao, Chuanli
    Tang, Hengyong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (01) : 131 - 136
  • [50] Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
    Moslehi, G.
    Mirzaee, M.
    Vasei, M.
    Modarres, M.
    Azaron, A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 122 (02) : 763 - 773