Performance Indicators for Spare Parts and Maintenance Management: An Analytical Study

被引:2
作者
Bounou, Oumaima [1 ]
El Barkany, Abdellah [1 ]
El Biyaali, Ahmed [1 ]
机构
[1] Sidi Mohammed Ben Abdellah Univ, Fac Sci & Tech, Mech Engn Lab, Fes, Morocco
来源
JOURNAL OF ENGINEERING | 2020年 / 2020卷
关键词
JOINT OPTIMIZATION; INVENTORY;
D O I
10.1155/2020/2950789
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A properly implemented maintenance management system has an impact at different levels. Maintenance is defined as the set of actions to maintain a property in a specified state. The unavailability of the spare parts required, to carry out the maintenance intervention, causes an extension of the inactivity time of the installation. On the contrary, an excessive stock of spare parts confines enormous capital and entails an enormous cost of ownership. According to the literature already made, we have directed in our work to propose a model of joint management of maintenance and spare parts based on stochastic-deterministic batch Petri networks. We studied this model by simulation using a graphical interface dedicated to the graphical tool used. So, we present, in this paper, the analytical study of the model by defining the performance indicators and viewing the influence of system parameters on these indicators. The main stages of the analytical study are developing the mu-marking graph, the associated Markov process which gives the associated transition matrix, and the definition of performance indicators using the probability distribution of the states. We deal with an application of the analytical evaluation of the proposed model. We end this article with an analysis and synthesis.
引用
收藏
页数:22
相关论文
共 22 条
[1]  
Abbou R., 2001, P 4 C FRANC MOD SIM
[2]  
Ayadi I., P 17 RISK CONTR DEP
[3]  
Babu A. Subash, 2013, International Journal of Productivity and Quality Management, V11, P247
[4]   An approximate approach for the joint problem of level of repair analysis and spare parts stocking [J].
Basten, R. J. I. ;
van der Heijden, M. C. ;
Schutten, J. M. J. ;
Kutanoglu, E. .
ANNALS OF OPERATIONS RESEARCH, 2015, 224 (01) :121-145
[5]  
Bayarassou M., 2010, APPROCHE DEVALUATION
[6]   Stochastic and Deterministic Petri Networks Model for Joint Management Model for Spare Parts and Maintenance: Simulation Study [J].
Bounou, Oumaima ;
El Barkany, Abdellah ;
El Biyaali, Ahmed .
INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2020, 46 :180-188
[7]   Inventory models for spare parts management: A review [J].
Bounou, Oumaima ;
El Barkany, Abdellah ;
El Biyaali, Ahmed .
International Journal of Engineering Research in Africa, 2017, 28 :182-198
[8]  
Brezavscek Alenka, 2011, Organizacija, V44, P120, DOI 10.2478/v10051-011-0012-y
[9]   Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems [J].
de Smidt-Destombes, Karin S. ;
van der Heijden, Matthieu C. ;
van Harten, Aart .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) :260-268
[10]  
Diallo C., 2006, THESIS