Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects

被引:67
作者
Ahn, Seungjun [1 ]
Shokri, Samin [2 ]
Lee, SangHyun [3 ]
Haas, Carl T. [2 ]
Haas, Ralph C. G. [2 ]
机构
[1] Univ South Australia, Sch Nat & Built Environm, North Terrace & Frome Rd, Adelaide, SA 5000, Australia
[2] Univ Waterloo, Dept Civil & Environm Engn, 200 Univ Ave West, Waterloo, ON N2L 3G1, Canada
[3] Univ Michigan, Dept Civil & Environm Engn, 2350 Hayward St,Room 2340 GG Brown Bldg, Ann Arbor, MI 48109 USA
关键词
Engineering and construction; Interface management; Project complexity; Project management; SYSTEM; MODEL;
D O I
10.1061/(ASCE)ME.1943-5479.0000488
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Recently, formal approaches to interface management (IM) have been adopted in a number of large-scale engineering and construction (E&C) projects. However, understanding of the role and performance of IM practices in E&C projects is quite limited today. Given this circumstance, this paper attempts to understand the effectiveness of IM practices in E&C projects from the perspective of dealing with project complexity. To fulfill the objective, data on project complexity and IM practices were collected from 45 large-scale E&C projects and analyzed using quantitative analysis methods such as principal component analysis and linear regression. The data analysis revealed that current formal IM practices employed in E&C projects are effective for mitigating the adverse impact of project complexity originating from uncertainty in scope and communication and large numbers of stakeholders; however, they are not as effective for dealing with project complexity originating from large numbers of engineered items. These results provide insights into the direction of future advancement in IM techniques for large-scale E&C projects.
引用
收藏
页数:12
相关论文
共 58 条
[1]  
[Anonymous], 2009, P 9 INT RES NETW PRO
[2]  
[Anonymous], 2002, Principal components analysis
[3]  
[Anonymous], 2004, PRACTICAL ASSESSMENT, DOI [DOI 10.7275/KTZQ-JQ66, 10.7275/ktzq-jq66]
[4]  
Baccarini D., 1996, International Journal of Project Management, V14, P201, DOI 10.1016/0263-7863(95)00093-3
[5]   Adaptation and Integration for Multinational Project-Based Organizations [J].
Berteaux, Florence ;
Javernick-Will, Amy .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
[6]   Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework [J].
Bosch-Rekveldt, Marian ;
Jongkind, Yuri ;
Mooi, Herman ;
Bakker, Hans ;
Verbraeck, Alexander .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) :728-739
[7]  
Boyd D., 2003, TAVISTOCK STUDIES BU, P69
[8]   SCREE TEST FOR NUMBER OF FACTORS [J].
CATTELL, RB .
MULTIVARIATE BEHAVIORAL RESEARCH, 1966, 1 (02) :245-276
[9]   Interface management for China's build-operate-transfer projects [J].
Chan, WT ;
Chen, C ;
Messner, JI ;
Chua, DKH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (06) :645-655
[10]  
Chems A., 1984, CONSTRUCTION MANAGEM, P177, DOI DOI 10.1080/01446198400000016