Mine closure risk management: An integration of 3D risk model and MCDM techniques

被引:65
作者
Amirshenava, Sina [1 ]
Osanloo, Morteza [1 ]
机构
[1] Amirkabir Univ Technol, Dept Min & Met Engn, POB 15875-4413,424 Hafez Ave, Tehran, Iran
关键词
Mine closure; Sustainable development; Risk management; 3D risk model; Mine reclamation; Multi-criteria decision making; DECISION-SUPPORT-SYSTEM; OPEN-PIT MINE; LAND-USE; RECLAMATION; METHODOLOGY; PROMETHEE; FRAMEWORK; RANKING; SITES;
D O I
10.1016/j.jclepro.2018.01.186
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Mine life is limited to mineable reserve, but economic, social and environmental factors can make mine life shorter than what is expected. Mine closure is associated with adverse on-site and off-site impacts such as unemployment, the loss of community services and pollution which threaten achieving the sustainable development goals. Therefore, mine closure risk management is necessary for reducing the negative effects. The present study aimed to develop a generic procedure for mine closure risk management. To this end, a three dimensional (3D) risk model was developed for assessing mine closure risks. The 3D risk model can fix the deficiency of 2D risk model by considering the time value of risk. Mine reclamation is a risk treatment option which requires the selection of optimal Post-Mining Land Use (PMLU). The optimal PMLU depends on the risks identified by the 3D risk model. In addition, a hybrid approach involving three Multi-Criteria Decision Making (MCDM) methods was developed for optimal PMLU selection. Twenty six different criteria including six economic, four technical, three landscape and environmental, seven social and six mine site factors were proposed. Finally, the proposed risk management approach was implemented in Choghart iron ore mine of Iran. The results indicated that the identified events had a 51.4% low, 22.9% medium, 143% high and 11.4% extreme risk levels and accordingly revegetation with native species was recommended as the optimal PMLU. Compared with the 2D risk model, the assessment results are more effective and practical by adding the time value of risk which can help budget planning for risk treatment. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:389 / 401
页数:13
相关论文
共 65 条
[1]  
[Anonymous], RISK MAN LEAD PRACT
[2]  
[Anonymous], 2009, ISO 31000
[3]  
[Anonymous], RISK ASS 3D MOD ENV
[4]  
[Anonymous], 2016, IEEE CONF COMPUT
[5]  
[Anonymous], 2013, 6 INT C SUST DEV MIN
[6]  
[Anonymous], 2009, ENVIRON GEOL, DOI DOI 10.1007/s00254-008-1563-y
[7]  
[Anonymous], P POSTM S NANC FRANC
[8]  
[Anonymous], MINE RECLAMATION
[9]  
[Anonymous], 12 INT S ENV ISS WAS
[10]  
[Anonymous], HDB W RECLAMATION TE