Water-resource Optimization Problem of Inland Waterways based on Network Flows with Flow Transition Time and Time Varying Characteristics

被引:0
作者
Duviella, Eric [1 ,2 ]
Hadid, Baya [1 ,2 ]
Alves, Debora C. C. S. [1 ,2 ]
机构
[1] Inst Mines Telecom Lille Douai, F-59000 Lille, France
[2] Univ Lille, Lille, France
来源
ICINCO: PROCEEDINGS OF THE 16TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1 | 2019年
关键词
Model Graph; Large Scale Systems; Optimization; Modelling; Water System;
D O I
10.5220/0007924603030310
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Water-resource allocation planning is a well studied problem that aims at sharing water-resource to answer to multi-objective management. For inland waterways, water-resource has to be balanced among the networks to guaranty navigation conditions as a priority. Hydraulic devices such as locks and gates are used to transfer volumes of water between the interconnected navigation reaches that composed the network. By considering a large spatial scale with a low control time scale, transport delays have to be considered. Hence, network flows with flow transition time and time varying characteristics is proposed to deal with transport delays and modifications of the operating conditions over time. Network flows are then used for the optimization step. The proposed model and optimization approach are illustrated by considering an inland waterway that is composed of two navigation reaches.
引用
收藏
页码:303 / 310
页数:8
相关论文
共 23 条
  • [1] Ahuja Ravindra K, 1993, Network Flows: Theory, Algorithms and Applications
  • [2] Alves D. C. S., 2018, ICINCO
  • [3] Amigoni F, 2015, PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON AUTONOMOUS AGENTS & MULTIAGENT SYSTEMS (AAMAS'15), P821
  • [4] [Anonymous], 2014, HIC 2014
  • [5] Ayoub T., 2018, HIC C PAL JUL 1 6
  • [6] A flood decrease strategy based on flow network coupled with a hydraulic simulation software
    Bencheikh, Ghita
    Tahiri, Ayoub
    Chiron, Pascale
    Archimede, Bernard
    Martignac, Francis
    [J]. IFAC PAPERSONLINE, 2017, 50 (01): : 3171 - 3176
  • [7] Duviella E, 2018, J WATER RES PLAN MAN, V144, DOI [10.1061/(asce)wr.1943-5452.0000970, 10.1061/(ASCE)WR.1943-5452.0000970]
  • [8] Maximum flow problem on dynamic generative network flows with time-varying bounds
    Fathabadi, Hassan Salehi
    Hosseini, Seyed Ahmad
    [J]. APPLIED MATHEMATICAL MODELLING, 2010, 34 (08) : 2136 - 2147
  • [9] Fulkerson D., 1966, AM MATH MONTHLY, V73
  • [10] Hadid B., 2018, ICINCO