A comprehensive review of disputes prevention and resolution in construction projects

被引:32
作者
Alaloul, Wesam S. [1 ]
Hasaniyah, Mohammed W. [2 ]
Tayeh, Bassam A. [2 ]
机构
[1] Univ Teknol PETRONAS, Dept Civil & Environm Engn, Seri Iskandar, Malaysia
[2] Islamic Univ Gaza, Dept Civil Engn, Fac Engn, Gaza, Palestine
来源
2ND CONFERENCE FOR CIVIL ENGINEERING RESEARCH NETWORKS (CONCERN-2 2018) | 2019年 / 270卷
关键词
CONTRACT;
D O I
10.1051/matecconf/201927005012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is complex, fragmented, dynamic and involves many parties in an adversarial relationship. This makes disputes almost inevitable in any construction project. This paper aims to provide a comprehensive review of the adopted methodologies in resolving disputes that arise in the construction projects. The paper evaluates and classifies the different methods of disputes resolution. A comparison was conducted between the advantages and disadvantages of each method. The paper distinguishes between the traditional method of disputes resolution; litigation and Alternative Dispute Resolution (ADR) methods such as arbitration, mediation, med/arb, mini-trial and dispute review board. In conclusion there is no best way to solve all kind of disputes in construction projects, however, a general step by step process of how disputes should be addressed is finally presented.
引用
收藏
页数:7
相关论文
共 66 条
[1]   Conflicting factors in construction projects: Korean perspective [J].
Acharya, Nirmal ;
Lee, Young ;
Im, Hae .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (06) :543-+
[2]  
Alaloul W., 2016, ENG CHALLENGES SUSTA
[3]  
Alaloul WS, 2016, ENGINEERING CHALLENGES FOR SUSTAINABLE FUTURE, P149
[4]  
Alaloul W. S., 2018, MATEC WEB C
[5]  
Alaloul W. S., 2015, APPL MECH MAT
[6]  
Alaloul W. S., J APPL SCI AGR
[7]  
Alaloul W. S., 2017, IOP C SERIES MAT SCI
[8]  
Alaloul W. S., 2015, TECHN MAN EM TECHN I
[9]   A Framework for Coordination Process into Construction Projects [J].
Alaloul, Wesam S. ;
Liew, Mohd Shahir ;
Zawawi, Noor Amila B. W. A. .
4TH INTERNATIONAL BUILDING CONTROL CONFERENCE 2016 (IBCC 2016), 2016, 66
[10]   An Artificial neural networks (ANN) model for evaluating construction project performance based on coordination factors [J].
Alaloul, Wesam Salah ;
Liew, Mohd Shahir ;
Zawawi, Noor Amila Wan ;
Mohammed, Bashar S. ;
Adamu, Musa .
COGENT ENGINEERING, 2018, 5 (01) :1-18