Algorithmic Development and Industrial Applications of Short-term Hydro Scheduling in the Nordic Power Market

被引:0
作者
Skjelbred, Hans Ivar [1 ]
Kong, Jiehong [1 ]
Aasgard, Ellen Krohn [1 ]
Belsnes, Michael Martin [1 ]
Fosso, Olav Bjarte [2 ]
机构
[1] SINTEF Energy Res, Dept Energy Syst, Trondheim, Norway
[2] Norwegian Univ Sci & Technol, Dept Elect Power Engn, Trondheim, Norway
来源
2022 IEEE PES 14TH ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE, APPEEC | 2022年
关键词
Optimization; Mixed integer linear programming; Simulation; Short-term hydro scheduling; UNIT COMMITMENT; GENERATION;
D O I
10.1109/APPEEC53445.2022.10072168
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper summarizes the algorithmic development and industrial applications of short-term hydro scheduling (STHS) in the Nordic power market. It focuses on the modeling techniques and solution methodologies applied to solve new challenges related to the large-scale integration of non-dispatchable renewable energy in the electric power system. Three optimization and simulation tools developed for STHS are presented. The tools are widely used in the Nordic hydropower industry and are part of business-critical daily scheduling, trading, and energy management operations.
引用
收藏
页数:6
相关论文
共 25 条
[1]   Optimizing day-ahead bid curves in hydropower production [J].
Aasgård E.K. ;
Naversen C.Ø. ;
Fodstad M. ;
Skjelbred H.I. .
Energy Systems, 2018, 9 (02) :257-275
[2]  
[Anonymous], SHAR HYDR POW EL PRO
[3]  
Babayev P., 2022, THESIS NORWEGIAN U S
[4]   Applying successive linear programming for stochastic short-term hydropower optimization [J].
Belsnes, M. M. ;
Wolfgang, O. ;
Follestad, T. ;
Aasgard, E. K. .
ELECTRIC POWER SYSTEMS RESEARCH, 2016, 130 :167-180
[5]   A four-dimensional model of hydro generation for the short-term hydrothermal dispatch problem considering head and spillage effects [J].
Diniz, Andre Luiz ;
Pineiro Maceira, Maria Elvira .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :1298-1308
[6]   Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming [J].
Finardi, EC ;
da Silva, EL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (02) :835-844
[7]   Hydro unit commitment and loading problem for day-ahead operation planning problem [J].
Finardi, Erlon Cristian ;
Scuzziato, Murilo Reolon .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 44 (01) :7-16
[8]   Stochastic programming for optimizing bidding strategies of a Nordic hydropower producer [J].
Fleten, Stein-Erik ;
Kristoffersen, Trine Krogh .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :916-928
[9]  
Follestad T., PROC 2011 17 POWER S
[10]  
Fosso OB, 2004, 2004 International Conference on Power System Technology - POWERCON, Vols 1 and 2, P1321