Connector structure-based modeling of assembly sequence planning

被引:3
|
作者
Su, Yingying [1 ]
Liang, Di [1 ]
Dong, Hai [1 ]
机构
[1] Shenyang Univ, Sch Mech Engn, Shenyang 110044, Liaoning, Peoples R China
关键词
Connector structure; Assembly sequence planning; Modeling;
D O I
10.4028/www.scientific.net/AMM.496-500.2729
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Assembly Sequence planning is one of the important stages during the product manufacturing process. For the purpose of effectively reducing the degree of complexity and improving the efficiency, the modeling method of assembly sequence planning based on connector structures is proposed. The concept of connector structure is presented, which is regarded as basic assembly units to cover features of assembly parts and package functional parts and connectors. The model of assembly sequence planning is built, which represents the precedence constraint relationship among connector structures. Finally, an example is studied and the model of assembly sequence planning based on connector structure is built to illustrate the effectiveness of the modeling method.
引用
收藏
页码:2729 / 2732
页数:4
相关论文
共 50 条
  • [1] Assembly sequence planning based on connector structure and ant colony algorithm
    Su, Yingying
    Dong, Hai
    Liang, Di
    ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 2482 - 2486
  • [2] A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies
    Yin, ZP
    Ding, H
    Li, HX
    Xiong, YL
    COMPUTER-AIDED DESIGN, 2003, 35 (01) : 37 - 56
  • [3] Assembly modeling for assembly sequence planning
    School of Mechatronics Engineering, University of Electronic Science and Technology of China, Chengdu 610054, China
    Jisuanji Jicheng Zhizao Xitong, 2007, 12 (2365-2372+2387):
  • [4] Assembly sequence planning using directed-connector knowledge
    Dong, Tianyang
    Tong, Ruofeng
    Zhang, Ling
    Dong, Jinxiang
    Jisuanji Fuzhu Sheji Yu Tuxingxue Xuebao/Journal of Computer-Aided Design and Computer Graphics, 2004, 16 (01): : 128 - 133
  • [5] A multi-agent evolutionary algorithm for connector-based assembly sequence planning
    Zeng, Congwen
    Gu, Tianlong
    Zhong, Yanru
    Cai, Guoyong
    CEIS 2011, 2011, 15
  • [6] A sequential consideration for assembly sequence planning and assembly line balancing using the connector concept
    Tseng, HE
    Tang, CE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (01) : 97 - 116
  • [7] Assembly sequence planning based on connecter-structure knowledge
    Li, Rong
    Fu, Yi-Li
    Feng, Hai-Bo
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2008, 14 (06): : 1130 - 1135
  • [8] Assembly sequence planning based on structure cells in open design
    Li, Shipei
    Tang, Dunbing
    Xue, Deyi
    Wang, Qi
    Zhu, Haihua
    ADVANCED ENGINEERING INFORMATICS, 2022, 53
  • [9] Structure-based carbon nanotube sorting by sequence-dependent DNA assembly
    Zheng, M
    Jagota, A
    Strano, MS
    Santos, AP
    Barone, P
    Chou, SG
    Diner, BA
    Dresselhaus, MS
    McLean, RS
    Onoa, GB
    Samsonidze, GG
    Semke, ED
    Usrey, M
    Walls, DJ
    SCIENCE, 2003, 302 (5650) : 1545 - 1548
  • [10] Study on assembly modeling and layered sequence planning
    Yu, Jian-min
    Cai, Jian-guo
    Jixie Kexue Yu Jishu/Mechanical Science and Technology, 2000, 19 (04): : 671 - 673