Application of C4.5 Algorithm in Evaluation of Railway Large Maintenance Machinery Construction

被引:0
作者
Zhu, Weiqiao [1 ]
Shi, Tianyun [1 ]
机构
[1] China Acad Railway Sci, Inst Comp Technol, Beijing 100081, Peoples R China
来源
FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE IV, PTS 1-5 | 2014年 / 496-500卷
关键词
Evaluation; Railway Large Maintenance Machinery (RLMM); C4.5; Algorithm; Decision Tree;
D O I
10.4028/www.scientific.net/AMM.496-500.1770
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With improvement of the level of modernization and mechanization of railway infrastructure maintenance, Railway large maintenance machinery (RLMM) is considered to be one of the main equipment. We have accumulated large amounts of RLMM construction data. How to mine valuable information from these data has become an important research subject. The C4.5 algorithm of decision tree is a useful method of data mining and classification. The paper solves evaluation of RLMM construction problem based on the C4.5 algorithm. By means of extracting the attribute with maximum gain ratio as the root node of the decision tree from training sample data, the evaluation decision tree was constructed. The decision tree modeling of evaluation of RLMM construction was gained by the post-pruning approach. The experimental results and analysis show that this model has high precision and credibility.
引用
收藏
页码:1770 / 1773
页数:4
相关论文
共 6 条
[1]  
[Anonymous], 2014, C4. 5: programs for machine learning
[2]  
Kantardzic M., 2011, Data mining: Concepts, models, methods, and algorithms
[3]  
[唐慧强 Tang Huiqiang], 2013, [计算机应用, Journal of Computer Applications], V33, P1467
[4]  
Wu Nan, 2006, COMPUTER TECHNOLOGY, V16, P1
[5]  
Zhang Xiaolong, 2005, J COMPUTER APPL, V25, P1986
[6]  
Zhu Weiqiao, 2011, CHINESE RAILWAYS, V5, P51