RISK MANAGEMENT FRAMEWORK FOR BUILD, OPERATE AND TRANSFER (BOT) PROJECTS IN KUWAIT

被引:15
作者
Al-Azemi, Khalid Fahad [1 ]
Bhamra, Ran [1 ]
Salman, Ahmed F. M. [2 ]
机构
[1] Univ Loughborough, Wolfson Sch Mech & Mfg Engn, Loughborough LE11 3TU, Leics, England
[2] Dammam Univ, Coll Engn, Construct Engn Dept, Dammam, Saudi Arabia
关键词
build/operate/transfer (BOT); construction management; risk analysis; risk management framework; INFRASTRUCTURE PROJECTS; CONSTRUCTION PROJECTS; CONTRACT PROJECTS; CONCESSION MODEL; TENDER; NEGOTIATION; CAPACITY;
D O I
10.3846/13923730.2013.802706
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Successful implementation of build-operate-transfer (BOT), infrastructure projects is dependent on a full and thorough analysis of factors that include social, economic and political, amongst others. Alongside the financially focused evaluations, qualitative factors will also have a strong impact on the project and so require specific techniques for the analysis. This paper presents a new evaluation framework, based on the analytical hierarchy process technique, for use in assessing the most common and significant decision factors relating to risks in BUT projects. Consultations with an expert group identified a series of risk decision factors. The results produced twenty-eight critical Risk Factors, which have a particular impact on the risks of BUT projects. The project risk framework was constructed by classifying the factors into five categories. The framework was successfully validated using a BOT project case study. This research seeks to make a valuable contribution to the field by having developed and validated a new risk evaluation framework, focused on BUT projects in Kuwait.
引用
收藏
页码:415 / 433
页数:19
相关论文
共 51 条
[1]  
Ahmed F. M. S., 2007, J CONSTR ENG M ASCE, V133, P50, DOI [10.1061/(ASCE)0733-9364(2007)133:1(50), DOI 10.1061/(ASCE)0733-9364(2007)133:1(50)]
[2]  
[Anonymous], 1995, PRIVATIZED INFRASTRU
[3]  
[Anonymous], J MANAGE ENG
[4]   Problems facing parties involved in build, operate, and transport projects in Egypt [J].
Askar, MM ;
Gab-Allah, AA .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (04) :173-178
[5]  
Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
[6]   THE PUBLIC SECTOR'S PERSPECTIVE ON PROCURING PUBLIC WORKS PROJECTS - COMPARING THE VIEWS OF PRACTITIONERS IN HONG KONG AND AUSTRALIA [J].
Cheung, Esther ;
Chan, Albert P. C. ;
Kajewski, Stephen .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) :19-32
[7]  
Dey P.K., 2002, INT J RISK ASSESSMEN, V3,, P269
[8]   Selection and application of risk management tools and techniques for build-operate-transfer projects [J].
Dey, PK ;
Ogunlana, SO .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (3-4) :334-346
[9]   DEBT CAPACITY AND OPTIMAL CAPITAL STRUCTURE FOR PRIVATELY FINANCED INFRASTRUCTURE PROJECTS [J].
DIAS, A ;
IOANNOU, PG .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04) :404-414
[10]  
Dias Jr A., 1995, 9509 UMCEE, V1