Value Stream Mapping: a study about the problems and challenges found in the literature from the past 15 years about application of Lean tools

被引:118
作者
Dal Forno, Ana Julia [1 ]
Pereira, Fernando Augusto [2 ,3 ]
Forcellini, Fernando Antonio [1 ]
Kipper, Liane M. [2 ,3 ]
机构
[1] Santa Catarina Fed Univ UFSC, Dept Prod & Syst Engn, Florianopolis, SC, Brazil
[2] Univ Santa Cruz do Sul UNISC, Dept Chem & Phys, Santa Cruz Do Sul, Brazil
[3] Univ Santa Cruz do Sul UNISC, Postgrad Program Ind Syst & Proc, Santa Cruz Do Sul, Brazil
关键词
Lean manufacturing; Value stream mapping; Lead time reduction; Process; Improvement; SUPPLY CHAIN; MANAGEMENT; IMPACT;
D O I
10.1007/s00170-014-5712-z
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Value stream mapping (VSM) is an important tool of the lean approach and is used to identify value-adding activities and those considered wasteful of materials and the flow of information and people. However, when not applied correctly, VSM can complicate the identification of waste, lead to misinterpretations and assessment mistakes, and undermine the implementation of future improvements. The purpose of this paper is to investigate the main difficulties and limitations encountered during the construction of current state maps, analysis of the associated causes, and pointing out of guidelines to facilitate the use of VSM to map processes. To do so, a search and evaluation of papers in journals, conferences, theses, and dissertations was conducted, and the articles were categorized according to the field of application (factory floor, supply chain, product development and services) and approach (theoretical or practical). In conclusion, this paper criticizes some ways that VSM has been used, observing that important constraints created by its application must be considered and that when used incorrectly, the tool can lead to mistakes that can cause problems instead of benefits. Considering the problems identified, the paper suggests future works for improving the use of VSM for mapping processes.
引用
收藏
页码:779 / 790
页数:12
相关论文
共 85 条
[1]   Redesigning an assembly line through lean manufacturing tools [J].
Alvarez, Roberto ;
Calvo, Roque ;
Pena, Marta M. ;
Domingo, Rosario .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (9-10) :949-958
[2]  
[Anonymous], 2005, Product Development Value Stream Mapping (PDVSM) Manual (Issue September)
[3]  
[Anonymous], P INT COUNC AER SCI
[4]  
[Anonymous], 2008, CHEM INT
[5]  
[Anonymous], 1998, TOYOTA PRODUCTION SY
[6]  
AR Rahani., 2012, Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study
[7]   Performance of Lean in large organisations [J].
Bhasin, Sanjay .
JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (03) :349-357
[8]   Supplier dependence: impact on supplier's participation and performance [J].
Carr, Amelia S. ;
Kaynak, Hale ;
Hartley, Janet L. ;
Ross, Anthony .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2008, 28 (9-10) :899-916
[9]   Supply chain management with lean production and RFID application: A case study [J].
Chen, James C. ;
Cheng, Chen-Huan ;
Huang, PoTsang B. .
EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (09) :3389-3397
[10]  
Chiavenato I., 1997, INTRO TEORIA GERAL A, V5th