Safety analysis of water supply to water treatment plant

被引:0
作者
Tchorzewska-Cieslak, B. [1 ]
Papciak, D. [1 ]
Koszelnik, P. [1 ]
Kaleta, J. [1 ]
Puszkarewicz, A. [1 ]
Kida, M. [1 ]
机构
[1] Rzeszow Univ Technol, Fac Civil & Environm Engn & Architecture, Rzeszow, Poland
来源
ENVIRONMENTAL ENGINEERING V | 2017年
关键词
water supply system; safety analysis; water treatment plant; RISK; MANAGEMENT; FAILURE;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Collective water supply system safety analysis should include risk assessment of threats at each stage of water production, from the water intake through treatment, distribution to the point of delivery to consumers. The proposed method, using the definition of the expected value of water scarcity, enables to conduct the analysis and assessment of the risk of lack of water supply to the distribution subsystem, taking into account different combinations of reliability states. The paper analyses the operation of a water treatment plant. The analysis used data operational work of the water intake. The expected value is used as a measure of the risk of the lack of water supply. Calculations were carried out in two variants: for a nominal value, and for the theoretical increase in the demand for water, in which the nominal demand for water is two times higher than the current maximum water production.
引用
收藏
页码:1 / 6
页数:6
相关论文
共 31 条
  • [1] Apostolakis G., 1981, Reliability Engineering, V2, P135, DOI 10.1016/0143-8174(81)90019-6
  • [2] Boryczko K., 2015, ENVIRON PROT ENG, V40, P77
  • [3] Ezell B.C., 2000, J INFRASTRUCT SYST, V6, P118, DOI DOI 10.1061/(ASCE)1076-0342(2000)6:3(118)
  • [4] On the Complex Definition of Risk: A Systems-Based Approach
    Haimes, Yacov Y.
    [J]. RISK ANALYSIS, 2009, 29 (12) : 1647 - 1654
  • [5] Hastak M., 2001, J INFRASTRUCT SYST, V7, P67, DOI [DOI 10.1061/(ASCE)1076-0342(2001)7:2(67), 10.1061/(ASCE)1076-0342(2001)7:2(67)]
  • [6] Hrudey SE., 2004, Safe Drinking Water: Lessons from Recent Outbreaks in Affluent Nations
  • [7] Iwanejko R., 2009, WATER SUPPLY WATER Q, V1, P229
  • [8] The words of risk analysis
    Kaplan, S
    [J]. RISK ANALYSIS, 1997, 17 (04) : 407 - 417
  • [9] Kaplan S., RISK ANAL, V1, P11, DOI [10.1111/j.1539-6924.1981.tb01350.x, DOI 10.1111/J.1539-6924.1981.TB01350.X]
  • [10] The suitability assessment of a generalized exponential distribution for the description of maximum precipitation amounts
    Kazmierczak, Bartosz
    Kotowski, Andrzej
    [J]. JOURNAL OF HYDROLOGY, 2015, 525 : 345 - 351