Green logistics under imperfect production system: A Rough age based Multi-Objective Genetic Algorithm approach

被引:24
作者
De, Manoranjan [1 ]
Das, Barun [2 ]
Maiti, Manoranjan [1 ]
机构
[1] Vidyasagar Univ, Dept Appl Math Oceanol & Comp Programming, Midnapore 721102, WB, India
[2] Sidho Kanho Birsha Univ, Dept Math, Purulia, WB, India
关键词
Logistics; Defective production; Carbon emission; Management decision; Genetic algorithm; CAP-AND-TRADE; SUPPLY CHAIN; LOT-SIZE; MODEL; INVENTORY; QUALITY; DEMAND; POLICY; REWORK; REPLENISHMENT;
D O I
10.1016/j.cie.2018.03.021
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Imperfect economic production lot size (EPL) models are considered with time dependent defective rate. Here, defective production starts after the passage of some time from production commencement. Produced defective units are partially reworked and sold as fresh units. Under the environmental regulation, a cost (carbon tax) is charged by the government to mitigate global warming by reducing carbon emission (CE). Management also uses carbon trading when upper limit of carbon emission is given by the government. These costs bring a contradiction to a production manager. For more profit, if more production is decided, then CE and tax due to that are more. The models are formulated as single- and multi-objective profit maximization problems and solved using Rough age based single- and multi-objective Genetic Algorithms (RMOGAs). Numerical experiments are performed and graphical presentation of the results are depicted to illustrate the models. An algorithm with example for a firm management to achieve the maximum profit is also presented.
引用
收藏
页码:100 / 113
页数:14
相关论文
共 37 条
  • [1] Lot sizing with carbon emission constraints
    Absi, Nabil
    Dauzere-Peres, Stephane
    Kedad-Sidhoum, Safia
    Penz, Bernard
    Rapine, Christophe
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 227 (01) : 55 - 61
  • [2] [Anonymous], INT J MATH OPERATION
  • [3] The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    Ben-Daya, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) : 257 - 264
  • [4] Carbon Footprint and the Management of Supply Chains: Insights From Simple Models
    Benjaafar, Saif
    Li, Yanzhi
    Daskin, Mark
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (01) : 99 - 116
  • [5] Including sustainability criteria into inventory models
    Bouchery, Yann
    Ghaffari, Asma
    Jemai, Zied
    Dallery, Yves
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 222 (02) : 229 - 240
  • [6] Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework
    Chen, Kuang-Ku
    Wu, Mei-Fang
    Chiu, Singa Wang
    Lee, Chien-Hua
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (02) : 2232 - 2235
  • [7] The carbon-constrained EOQ
    Chen, Xi
    Benjaafar, Saif
    Elomri, Adel
    [J]. OPERATIONS RESEARCH LETTERS, 2013, 41 (02) : 172 - 179
  • [8] An optimal production and inspection strategy with preventive maintenance error and rework
    Chen, Yan-Chun
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 99 - 106
  • [10] A fast and elitist multiobjective genetic algorithm: NSGA-II
    Deb, K
    Pratap, A
    Agarwal, S
    Meyarivan, T
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) : 182 - 197