Estimation of time-variant probable maximum precipitation for South Korea

被引:3
作者
Kim, Nam Won [1 ]
Lee, Jeongwoo [1 ]
机构
[1] Korea Inst Civil Engn & Bldg Technol, Hydro Sci & Engn Res Inst, Goyang 10223, South Korea
关键词
long-term probable maximum precipitation; time-variant PMP; Hershfield's statistical approach; 2-DAY DURATION; REGION; MALAYSIA; MODEL;
D O I
10.1007/s12205-016-1052-x
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The objective of this study is to suggest a methodology for estimating the time-variant probable maximum precipitation. First, the greatest amount of precipitation for a relatively long duration, e.g., a month or longer, defined as the Long-term Probable Maximum Precipitation (LPMP) in the present work was estimated. Then, the procedure for using the LPMP estimates for determining the temporally varied upper limit of precipitation during a certain period of the year, defined as the time-variant PMP (TPMP) in this study was implemented. Hershfield's statistical approach was used to estimate LPMP, i.e., monthly, calendar monthly, and cumulative monthly, for each of 61 weather stations located in South Korea, and nationwide distribution maps of three types of LPMP were made. In particular, using the cumulative monthly PMP estimates and total antecedent precipitation prior to a certain time, the TPMP for a certain duration was forecast for example problems. From the case study for precipitation data at Chungju weather station, TPMP forecasts at certain stormy periods were substantially smaller than the design PMP, which implies that reservoir operation for flood control based on the design PMP may be too restrictive for some period. It is expected that the TPMP can serve as a complementary index to increase the water supply of a reservoir.
引用
收藏
页码:1031 / 1038
页数:8
相关论文
共 26 条
[1]  
Bruce J.P., 1966, Introduction to Hydrometeorology
[2]  
Chow V.T., 1951, EOS T AM GEOPHYS UN, V32, P231, DOI [DOI 10.1029/TR032I002P00231, 10.1029/TR032i002p00231]
[3]   Estimating probable maximum precipitation using a storm model approach [J].
Collier, CG ;
Hardaker, PJ .
JOURNAL OF HYDROLOGY, 1996, 183 (3-4) :277-306
[4]  
Desa M. N., 2003, INT ESTIMATE 24 HOUR, P35
[5]   Probable maximum precipitation for 24 h duration over southeast Asian monsoon region - Selangor, Malaysia [J].
Desa, MN ;
Noriah, AB ;
Rakhecha, PR .
ATMOSPHERIC RESEARCH, 2001, 58 (01) :41-54
[6]   Probable maximum precipitation for 24-h duration over an equatorial region: Part 2-Johor, Malaysia [J].
Desa-M, M. N. ;
Rakhecha, P. R. .
ATMOSPHERIC RESEARCH, 2007, 84 (01) :84-90
[7]  
Dhar O. N., 1969, IND J METEOR GEOPHYS, V22, P31
[8]  
Dhar O. N., 1975, Hydrological Sciences Bulletin, V20, P61
[9]  
Douglas EM, 2003, J HYDROMETEOROL, V4, P1012, DOI 10.1175/1525-7541(2003)004<1012:PMPEUM>2.0.CO
[10]  
2