Reliability of ship machinery plants and damage chains

被引:0
|
作者
Häkkinen, P [1 ]
机构
[1] Aalto Univ, Ship Lab, Helsinki, Finland
关键词
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Further improvement of ship machinery plants reliability requires more information about the single component failure rates. Background information about conditions and factors during the failures can be delivered by ship engineers. In many cases the failure modes and the reasons have not followed the anticipated patterns. Further engineering is required to predict various operation modes and damage chains.
引用
收藏
页码:661 / 667
页数:7
相关论文
共 50 条
  • [1] Reliability data collection for ship machinery
    Inozu, Bahadir
    Schaedel, Peter G.
    Molinari, Veronique
    Roy, Philippe
    Johns, Robert
    Marine Technology, 1998, 35 (02): : 119 - 125
  • [2] Reliability data collection for ship machinery
    Inozu, B
    Schaedel, PG
    Molinari, V
    Roy, P
    Johns, R
    MARINE TECHNOLOGY AND SNAME NEWS, 1998, 35 (02): : 119 - 125
  • [3] Component Criticality Analysis for Improved Ship Machinery Reliability
    Daya, Abdullahi Abdulkarim
    Lazakis, Iraklis
    MACHINES, 2023, 11 (07)
  • [4] Dynamic reliability analysis tool for ship machinery maintenance
    Dikis, K.
    Lazakis, I.
    Theotokatos, G.
    TOWARDS GREEN MARINE TECHNOLOGY AND TRANSPORT, 2015, : 619 - 626
  • [5] Dynamic risk and reliability assessment for ship machinery decision making
    Dikis, K.
    Lazakis, I.
    Michala, A. L.
    Raptodimos, Y.
    Theotokatos, G.
    RISK, RELIABILITY AND SAFETY: INNOVATING THEORY AND PRACTICE, 2017, : 685 - 692
  • [6] A framework for reliability assessment of ship hull damage under ship bow impact
    Obisesan, Abayomi
    Sriramula, Srinivas
    Harrigan, John
    SHIPS AND OFFSHORE STRUCTURES, 2016, 11 (07) : 700 - 719
  • [7] Performance and Reliability Monitoring of Ship Hybrid Power Plants
    Tsoumpris, Charalampos
    Theotokatos, Gerasimos
    JOURNAL OF ETA MARITIME SCIENCE, 2022, 10 (01) : 29 - 38
  • [8] OPTIMIZATION OF MAINTENANCE SCHEDULING OF SHIP BORNE MACHINERY FOR IMPROVED RELIABILITY AND REDUCED COST
    Verma, Ajit Kumar
    Srividya, A.
    Rana, Anil
    Khattri, Sanjay K.
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2012, 19 (03)
  • [9] RELIABILITY ALLOCATION AND PREDICTION FOR A FULLY DISTRIBUTED SHIP MACHINERY CONTROL-SYSTEM
    VAIL, JA
    KLEIN, SK
    NAVAL ENGINEERS JOURNAL, 1985, 97 (04) : 165 - 173
  • [10] PRACTICAL MACHINERY MANAGEMENT FOR PROCESS PLANTS, VOL 1 - IMPROVING MACHINERY RELIABILITY - BLOCK,HP
    PUROHIT, GP
    CHANDRA, K
    CHEMICAL ENGINEERING, 1984, 91 (01) : 114 - 115