Human resource allocation or recommendation based on multi-factor criteria in on-demand and batch scenarios

被引:18
作者
Arias, Michael [1 ]
Munoz-Gama, Jorge [1 ]
Sepulveda, Marcos [1 ]
Carlos Miranda, Juan [2 ]
机构
[1] Pontificia Univ Catolica Chile, Sch Engn, Comp Sci Dept, Vicuna Mackenna 4860, Macul 7820436, Chile
[2] Software & Consulting Grp, 36th St, San Jose, Costa Rica
关键词
human resource allocation; human resource recommendation; multi-factor criteria; on-demand; batch; dynamic resource allocation; recommender system; business process management; BPM; process mining; MULTIOBJECTIVE OPTIMIZATION; ASSIGNMENT; ALGORITHMS; SUPPORT; MODEL; TOOL;
D O I
10.1504/EJIE.2018.092009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Dynamic resource allocation is considered a major challenge in the context of business process management. At the operational level, flexible methods that support resource allocation and which consider different criteria at run-time are required. It is also important that these methods are able to support multiple allocations in a simultaneous manner. In this paper, we present a framework based on multi-factor criteria that proposes a recommender system which is capable of recommending the most suitable resources for executing a range of different activities, while also considering individual requests or requests made in blocks. To evaluate the proposed framework, a number of experiments were conducted using different test scenarios. These scenarios provide evidence that our approach based on multi-factor criteria successfully allocates the most suitable resources for executing a process in real and flexible environments. In order to demonstrate this assertion, we use a help-desk process as a real case study.
引用
收藏
页码:364 / 404
页数:41
相关论文
共 57 条
  • [31] Kumar A, 2001, J MANAGE INFORM SYST, V18, P157
  • [32] Mining event logs to support workflow resource allocation
    Liu, Tingyu
    Cheng, Yalong
    Ni, Zhonghua
    [J]. KNOWLEDGE-BASED SYSTEMS, 2012, 35 : 320 - 331
  • [33] Liu XM, 2014, IDEAS HIST MOD CHINA, V8, P49, DOI 10.1163/9789004265356_004
  • [34] A semi-automatic approach for workflow staff assignment
    Liu, Yingbo
    Wang, Jianmin
    Yang, Yun
    Sun, Jiaguang
    [J]. COMPUTERS IN INDUSTRY, 2008, 59 (05) : 463 - 476
  • [35] Liu YB, 2007, APPLIED COMPUTING 2007, VOL 1 AND 2, P340, DOI 10.1145/1244002.1244084
  • [36] Ly L. T., 2005, Business Process Management Workshops. BPM 2005 International Workshops BPI, BPD, ENEI, BPRM, WSCOBPM, BPS. Revised Selected Papers (Lecture Notes in Computer Science Vol. 3812), P177
  • [37] The weighted sum method for multi-objective optimization: new insights
    Marler, R. Timothy
    Arora, Jasbir S.
    [J]. STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2010, 41 (06) : 853 - 862
  • [38] Survey of multi-objective optimization methods for engineering
    Marler, RT
    Arora, JS
    [J]. STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2004, 26 (06) : 369 - 395
  • [39] McDonald R, 2007, LECT NOTES COMPUT SC, V4425, P557
  • [40] ALGORITHMS FOR THE ASSIGNMENT AND TRANSPORTATION PROBLEMS
    MUNKRES, J
    [J]. JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1957, 5 (01): : 32 - 38