FEASIBILITY OF SHIELD JUNCTION USING FREEZING METHOD IN QIONGZHOU STRAIT TUNNEL

被引:1
|
作者
Hu Xiangdong [1 ]
Wang Jintai [1 ]
机构
[1] Tongji Univ, Shanghai 200092, Peoples R China
关键词
Qiongzhou strait; Ground reinforcement; Freezing method; Shield junction; Frozen soil umbrella; Numerical simulation;
D O I
10.1109/ICDMA.2013.144
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Qiongzhou strait cross-sea project has attracted a lot of attention. Of all the plans discussed, the tunnel scheme is a potential one. Because of the long distance and great depth, Qiongzhou strait tunnel has many engineering problems. AGF (artificial ground freezing) has been widely used in many tunnels as a ground strengthening method. The feasibility of AGF in construction of Qiongzhou strait tunnel was studied by using finite element numerical simulation method. The simulation was conducted to compare different freezing plans, i.e., single-row-piped freezing and the double-row-piped freezing. In the simulation, different length of cutter head in circumferential direction was demolished, affecting the mechanical behavior and deformation of the frozen soil umbrella. The research demonstrates that the double-row-piped freezing is superior to the single one on safety. The length of cutter head demolished in circumferential direction has great influence on the mechanical behavior and deformation of the frozen soil umbrella. Guidance on construction can be obtained from the layout of this paper.
引用
收藏
页码:612 / 615
页数:4
相关论文
共 50 条
  • [31] Design and Analysis of Shaking Table Test on Shield Tunnel-shaft Junction
    Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai
    200092, China
    不详
    100083, China
    不详
    200092, China
    不详
    200092, China
    不详
    200063, China
    Zongguo Gonglu Xuebao, 8 (183-192):
  • [32] FINANCIAL FEASIBILITY OF THE SUNDA STRAIT BRIDGE CONCEPTUAL DESIGN USING THE VALUE ENGINEERING METHOD
    Berawi, Mohammed Ali
    Susantono, Bambang
    Miraj, Perdana
    Gunawan
    Berawi, Abdur Rohim Boy
    Husin, Albert
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : A17 - A22
  • [33] Simulation Modeling for Ships Entering and Leaving Port in Qiongzhou Strait Waters: A Multi-Agent Information Interaction Method
    Han, Dong
    Cheng, Xiaodong
    Chen, Hualong
    Xiao, Changshi
    Wen, Yuanqiao
    Sui, Zhongyi
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (09)
  • [34] Real time monitoring method for the longitudinal settlement of shield tunnel using wireless inclinometer
    Yin Jianguo
    Huang Hongwei
    PROCEEDINGS OF THE 2015 INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE, 2015, 7 : 274 - 280
  • [35] Prediction for segment strain and opening of underwater shield tunnel using deep learning method
    Tan, Xuyan
    Chen, Weizhong
    Yang, Jianping
    Du, Bowen
    Zou, Tao
    TRANSPORTATION GEOTECHNICS, 2023, 39
  • [36] Numerical study on crack problems in segments of shield tunnel using finite element method
    Chen, J. S.
    Mo, H. H.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (01) : 91 - 102
  • [38] Structural Damage Evaluation Method for Metro Shield Tunnel
    Huang, Zhen
    Fu, Helin
    Zhang, Jiabing
    Chen, Wei
    Shi, Yue
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2019, 33 (01)
  • [39] A Novel Method for Measuring Shield Tunnel Cross Sections
    Xue, Ya-dong
    Zhang, Sen
    Qi, Zhe-ting
    IMAGE AND GRAPHICS (ICIG 2017), PT III, 2017, 10668 : 47 - 57
  • [40] Design method of shield tunnel - Present status and subjects
    Koyama, Y
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 29 - 38