CAPACITY PLANNING MODEL FOR BASIC REFRACTORY PRODUCTION

被引:0
作者
Sindler, Vratislav [1 ]
Spisak, Jan [1 ]
机构
[1] Tech Univ Kosice, BERG Fac, Kosice, Slovakia
来源
PROCEEDINGS OF 11TH INTERNATIONAL CARPATHIAN CONTROL CONFERENCE, 2010 | 2010年
关键词
List Aggregated planning; production planning; Hierarchical balance sheet model (HBM); Geographic Information System (GIS);
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this contribution are described principles and procedures to create new plant planning system dealing with basic refractory production. Presently customers (market) require more and more specific products with attributes that sharply meet their production technology. Required product diversity creates pressure on the adaptable technology and on the transfer from standardized production to custom-built production. These changes require also new production planning process system design on the level of tactical-aggregated planning. The proposed aggregated planning system is presented by the three following mutually interconnected models: Customer-built logistics GIS of mining operation Hierarchical balance sheet model of raw material processing to the product..
引用
收藏
页码:435 / 438
页数:4
相关论文
共 6 条
[1]  
Dorcak D., 2004, ACTA MONTANISTICA
[2]  
MALINDZAK D., 1996, VYROBNA LOGISTIKA 1
[3]  
SMAK J, 2001, LOGISTIKA OBSLUZNYCH, VII
[4]  
SMAK J., 2001, LOGISTIKA OBSLUZNYCH
[5]  
Spisak J., 2008, TECHNOLOGICKE LOGIST
[6]  
SPISAK J., 2001, KOMERCNA LOGISTIKA