A coordinated scheduling problem for the supply chain in a flexible job shop machine environment

被引:7
作者
Ceylan, Zeynep [1 ]
Tozan, Hakan [2 ]
Bulkan, Serol [3 ]
机构
[1] Samsun Univ, Fac Engn, Ind Engn Dept, Samsun, Turkey
[2] Medipol Univ, Sch Engn & Nat Sci, Ind Engn Dept, Istanbul, Turkey
[3] Marmara Univ, Fac Engn, Ind Engn Dept, Istanbul, Turkey
关键词
Supply chain; Coordination; Flexible job shop scheduling; Multi-objective; MODM; GENETIC ALGORITHM; MULTIOBJECTIVE OPTIMIZATION; TARDINESS; DELIVERY; COSTS; MODEL;
D O I
10.1007/s12351-020-00615-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, a new coordinated scheduling problem is proposed for the multi-stage supply chain network. A multi-product and multi-period supply chain structure has been developed, including a factory, warehouses, and customers. Furthermore, the flexible job shop scheduling problem is integrated into the manufacturing part of the supply chain network to make the structure more comprehensive. In the proposed problem, each product includes a sequence of operations and is processed on a set of multi-functional machines at the factory to produce the final product. Final products are delivered to the warehouses to meet customers' demands. If the demands of customers are not fulfilled, the shortage in the form of backorder may occur at any period. The problem is expressed as a bi-objective mixed-integer linear programming (MILP) model. The first objective function is to minimize the total supply chain costs. On the other hand, the second objective function aims to minimize the makespan in all periods. A numerical example is presented to evaluate the performance of the proposed MILP model. Five multi-objective decision-making (MODM) methods, namely weighted sum, goal programming, goal attainment, LP metric, and max-min, are used to provide different alternative solutions to the decision-makers. The performance of the methods is evaluated according to both objective function values and CPU time criteria. In order to select the best solution technique, the displaced ideal solution method is applied. The results reveal that the weighted sum method is the best among all MODM methods.
引用
收藏
页码:875 / 900
页数:26
相关论文
共 46 条
[1]   Supply chain scheduling: Sequence coordination [J].
Agnetis, Alessandro ;
Hall, Nicholas G. ;
Pacciarelli, Dario .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (15) :2044-2063
[2]   Multi-agent supply chain scheduling problem by considering resource allocation and transportation [J].
Aminzadegan, Sajede ;
Tamannaei, Mohammad ;
Rasti-Barzoki, Morteza .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
[3]  
Augusto O, 2013, HAL00914025
[4]   JOB-SHOP SCHEDULING WITH MULTIPURPOSE MACHINES [J].
BRUCKER, P ;
SCHLIE, R .
COMPUTING, 1990, 45 (04) :369-375
[5]   A research survey: review of AI solution strategies of job shop scheduling problem [J].
Calis, Banu ;
Bulkan, Serol .
JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (05) :961-973
[6]  
Ceylan Z., 2019, J ENG SCI DESIGN, V7, P182
[7]   A research survey: review of flexible job shop scheduling techniques [J].
Chaudhry, Imran Ali ;
Khan, Abid Ali .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2016, 23 (03) :551-591
[8]   Integrated Production and Outbound Distribution Scheduling: Review and Extensions [J].
Chen, Zhi-Long .
OPERATIONS RESEARCH, 2010, 58 (01) :130-148
[9]   Integrated scheduling of production and distribution operations [J].
Chen, ZL ;
Vairaktarakis, GL .
MANAGEMENT SCIENCE, 2005, 51 (04) :614-628
[10]   Designing and solving a bi-level model for rice supply chain using the evolutionary algorithms [J].
Cheraghalipour, Armin ;
Paydar, Mohammad Mahdi ;
Hajiaghaei-Keshteli, Mostafa .
COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2019, 162 :651-668