A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints

被引:28
作者
Kim, H. -J. [1 ]
Lee, D. -H.
Xirouchakis, P.
机构
[1] Swiss Fed Inst Technol, EPFL, STI,IPR,LIPCP, CH-1015 Lausanne, Switzerland
[2] Hanyang Univ, Seoul 133791, South Korea
关键词
environmental studies; production and scheduling; heuristics;
D O I
10.1057/palgrave.jors.2602094
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the problem of determining the disassembly schedule (quantity and timing) of products in order to satisfy the demand of their parts or components over a finite planning horizon. The objective is to minimize the sum of set-up, disassembly operation, and inventory holding costs. As an extension of the uncapacitated versions of the problem, we consider the resource capacity restrictions over the planning horizon. An integer program is suggested to describe the problem mathematically, and to solve the problem, a heuristic is developed using a Lagrangean relaxation technique together with a method to find a good feasible solution while considering the trade-offs among different costs. The effectiveness of the algorithm is tested on a number of randomly generated problems and the test results show that the heuristic suggested in this paper can give near optimal solutions within a short amount of computation time.
引用
收藏
页码:1231 / 1240
页数:10
相关论文
共 25 条
[1]  
BOOTHROYD G, 1992, ANN CIRP, V41, P625
[2]   Effectiveness of planning and control systems: an empirical study of US and Japanese firms [J].
Sheu, CW ;
Wacker, JG .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) :887-905
[3]   CONVERGENCE RATES OF SUBGRADIENT OPTIMIZATION METHODS [J].
GOFFIN, JL .
MATHEMATICAL PROGRAMMING, 1977, 13 (03) :329-347
[4]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[5]  
HELD M, 1974, MATH PROGRAM, V6, P63
[6]  
Jovane F, 1993, CIRP ANN-MANUF TECHN, V42, P651
[7]  
Kang J.-G., 2002, J KOREAN I IND ENG, V28, P264
[8]  
Kang JG, 2003, INT J IND ENG-THEORY, V10, P407
[9]   Parallel disassembly sequencing with sequence-dependent operation times [J].
Kang, JG ;
Lee, DH ;
Xirouchakis, P ;
Persson, JG .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2001, 50 (01) :343-346
[10]   Disassembly scheduling with multiple product types [J].
Kim, HJ ;
Lee, DH ;
Xirouchakis, P ;
Züst, R .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2003, 52 (01) :403-406