Risk assessment for construction of urban rail transit projects

被引:78
作者
Yan, Hongyan [1 ]
Gao, Ce [2 ]
Elzarka, Hazem [2 ]
Mostafa, Kareem [3 ]
Tang, Wenbin [4 ]
机构
[1] Hunan Univ Finance & Econ, Dept Construct Management, Changsha 410205, Hunan, Peoples R China
[2] Univ Cincinnati, Dept Civil Architectural Engn & Construct Managem, Cincinnati, OH 45221 USA
[3] Univ Waterloo, Dept Civil Engn, Waterloo, ON N2L 3G1, Canada
[4] Changsha Univ Sci & Technol, Coll Econ & Management, Changsha 410114, Hunan, Peoples R China
关键词
Urban rail transit projects; Construction Risk Assessment; Vague Set; Fuzzy Matter-Element; Structure Entropy Weight; METRO CONSTRUCTION; ASSESSMENT METHODOLOGY; SAFETY MANAGEMENT; FUZZY;
D O I
10.1016/j.ssci.2019.05.042
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Taken all factors into consideration regarding the uncertainties of urban rail transit projects construction and incompatibility of the assessment conclusion, this paper proposes a vague fuzzy matter-element model for the risk assessment by combining vague set and matter-element theory. The risk assessment index system is based on a Work Breakdown Structure (WBS) Risk Breakdown Structure (RBS) risk identification matrix. Risk assessment indicators are features of the matter, and values of risk indicators are vague values; Correlation transformation is operated on optimal subordinate degree, and the weights of risk assessment indicators were defined by structure entropy weight method. The level of the risk matter evaluated was then determined, according to the principle of maximum proximity. At last, the practicability and effectiveness of the proposed model was verified by a case study.
引用
收藏
页码:583 / 594
页数:12
相关论文
共 40 条
[1]   Safety Assessment in Tunnel Grouting Using Fuzzy Rotational and Angular Models [J].
Al-Labadi, Khalid R. ;
Al-Humaidi, H. M. ;
Tan, F. Hadipriono .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2009, 23 (06) :423-431
[2]   Evaluation of tunnel safety: towards an economic safety optimum [J].
Arends, BJ ;
Jonkman, SN ;
Vrijling, JK ;
van Gelder, PHAJM .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2005, 90 (2-3) :217-228
[3]  
Cai W., 1994, Science and Technology Document
[4]  
Chen S. L., 2006, CHINESE J UNDERGR SP, V1
[5]   Similarity measures between vague sets and between elements [J].
Chen, SM .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 1997, 27 (01) :153-158
[6]  
[程启月 Cheng Qiyue], 2010, [系统工程理论与实践, Systems Engineering-Theory & Practice], V30, P1225
[7]  
China Urban Rail Transit Association, 2018, 2017 ANN STAT AN REP
[8]   Risk assessment methodology for underground construction projects [J].
Choi, HH ;
Cho, HN ;
Seo, JW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) :258-272
[9]   Fuzzy fault tree analysis: revisited [J].
Deshpande, Ashok .
INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2011, 2 (01) :3-13
[10]   Safety risk identification system for metro construction on the basis of construction drawings [J].
Ding, L. Y. ;
Yu, H. L. ;
Li, Heng ;
Zhou, C. ;
Wu, X. G. ;
Yu, M. H. .
AUTOMATION IN CONSTRUCTION, 2012, 27 :120-137