Complexity of the ELSP with general cyclic schedules

被引:35
作者
Gallego, G [1 ]
Shaw, DX [1 ]
机构
[1] PURDUE UNIV,SCH IND ENGN,W LAFAYETTE,IN 47907
关键词
D O I
10.1080/07408179708966318
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We show that the Economic Lot Schedule Problem (ELSP) is NP-hard in the strong sense under General Cyclic Schedules (GSC), Zero-Inventory Cyclic Schedules (ZICS), Time-Invariant Cyclic Schedules (TICS), Lot-Invariant Cyclic Schedules (LICS), and Basic Period Cyclic Schedules (BPCS).
引用
收藏
页码:109 / 113
页数:5
相关论文
共 11 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]   LOT SIZING AND SEQUENCING FOR N-PRODUCTS ON ONE FACILITY [J].
DELPORTE, CM ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1977, 23 (10) :1070-1079
[3]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[4]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[5]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[6]  
Gallego G., 1995, OPTIMIZATION IND, V3, P83
[7]  
HANSSMANN F, 1962, OPERATIONS RES PRODU, P158
[8]   A NOTE ON LINEAR-PROGRAMMING AND THE SINGLE-MACHINE LOT SIZE SCHEDULING PROBLEM [J].
HODGSON, TJ ;
NUTTLE, HLW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (04) :939-943
[10]  
MAXWLL WL, 1964, NAV RES LOG, V11, P98