共 50 条
- [1] Analysis of Power Planning Model Based on Minimizing the Initial Investment Cost CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 3237 - 3244
- [2] Analysis of Power Planning Model Based on Minimizing the Operation and Maintenance Cost RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY, PTS 1-6, 2014, 448-453 : 2681 - 2686
- [4] Long Term Microgrid Planning based on LCC Analysis for Different System Configurations 2018 INTERNATIONAL CONFERENCE ON CONTROL, POWER, COMMUNICATION AND COMPUTING TECHNOLOGIES (ICCPCCT), 2018, : 52 - 56
- [6] Planning model for cost-minimizing slab inventory of an integrated foundry OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 345 - 350
- [7] Approach of minimizing fuzzy unserved energy cost in electric power network planning Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2000, 20 (07): : 123 - 127
- [8] Load shedding model and algorithm based on minimizing power outage cost of multi-intervals Harbin Gongye Daxue Xuebao, 2008, 1 (95-99):
- [9] Cost-Based Power Distribution Optimization Scheduling in Microgrid 2017 3RD INTERNATIONAL CONFERENCE ON SCIENCE AND TECHNOLOGY - COMPUTER (ICST), 2017, : 87 - 92