A CRITICAL STUDY OF RISK ALLOCATION IN GUARANTEED MAXIMUM PRICE AND TARGET COST CONTRACTS IN HONG KONG

被引:0
作者
Chan, Joseph H. L. [1 ]
Chan, Daniel W. M. [1 ]
Lam, Patrick T. I. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
来源
PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1 | 2010年
关键词
Guaranteed Maximum Price; target cost contracting; risk allocation; questionnaire survey; Hong Kong; CONSTRUCTION-INDUSTRY; PROJECT; SUCCESS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Both the Guaranteed Maximum Price (GMT) and Target Cost Contracting (TCC) schemes are relatively novel procurement arrangements in the construction market of Hong Kong. Risk allocation is one of the fundamental functions of a construction contract. It is widely accepted to allocate a certain risk to the party best capable to manage such risk, especially in construction which is a risky business. Despite many research studies on GMP/TCC in the western world, those focusing on the risk aspects associated with these procurement forms are rather limited. An empirical questionnaire survey was launched to solicit the perceptions of industrial practitioners in Hong Kong on risk allocation for a total of 34 key risks of GMP/TCC identified from the literature review. The survey results were then cross-referenced to the risk allocation stated under the two standard forms of target cost contracts adopted within the United Kingdom, i.e. Institution of Civil Engineers (ICE) Contract and New Engineering Contract (NEC). The two standard forms of contract are found to be silent in the allocation of 9 risks out of 34. The allocation of 13 out of the remaining 25 risks matches with those stipulated in the standard forms. Moreover, it is indicated that the design-related risks are better to be taken by owners and the construction-related risks are perceived to be allocated to contractors, while physical risks are recommended to be shared or negotiated by both owners and contractors together. The survey findings could serve as a useful reference for desirable risk allocation for future GMP and Target Cost Contracts in construction.
引用
收藏
页码:205 / 215
页数:11
相关论文
共 27 条
  • [1] Andi, 2008, CONSTRUCTION MANAGEM, V24, P69
  • [2] The selection of sharing ratios in target cost contracts
    Badenfelt, Ulrika
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (01) : 54 - +
  • [3] Boukendour S., 2001, Construction Management and Economics, V19, P563
  • [4] Incentive mechanisms for project success
    Bower, D
    Ashby, G
    Gerald, K
    Smyk, W
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (01) : 37 - 43
  • [5] Broome J., 2002, INT J PROJ MANAG, V20, P59, DOI DOI 10.1016/S0263-7863(00)00035-1
  • [6] Bubshait A. A., 2003, International Journal of Project Management, V21, P63, DOI 10.1016/S0263-7863(01)00078-3
  • [7] Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong
    Chan, Albert P. C.
    Chan, Daniel W. M.
    Fan, Linda C. N.
    Lam, Patrick T. I.
    Yeung, John F. Y.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2008, 24 (03) : 128 - 137
  • [8] Chan D. W. M, 2007, RES MONOGRAPH DEP BU
  • [9] Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Lam, Edmond
    Wong, James
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) : 139 - +
  • [10] Cheng Rebecca L. L., 2004, THESIS