Use of Forest Residues for Building Forest Biomass Supply Chains: Technical and Economic Analysis of the Production Process

被引:19
作者
Cozzi, Mario [1 ]
Di Napoli, Francesco [1 ]
Viccaro, Mauro [1 ]
Romano, Severino [1 ]
机构
[1] Univ Basilicata, Sch Agr Sci Forestry Food & Environment SAFE, I-85100 Potenza, Italy
关键词
biomass; forest energy chain; geographic information systems; cost-effective use of biomass; ECOSYSTEM SERVICES; GIS; MULTICRITERIA; SYSTEM; COST;
D O I
10.3390/f4041121
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
In the field of biomass and bio-energy production, an analysis was performed of the whole production process from biomass supply to bio-energy production. The available biomass, harvesting and transportation costs and the distribution of supply area were quantified. The assessment of volumes was based on forest type and its relative increment. The transportation costs, influenced by different species-specific and site-specific factors, were calculated by integrating data in a geographic information system (GIS). The economic values calculated were the main economic indicators (net present value (NPV), internal rate of return (IRR) and Payback Period). The results show that: (a) there is a good supply of forest biomass across most of the territory of Basilicata region, Italy; (b) the harvesting and transportation costs are dependent on biomass density and distances; (c) there are strong margins for economic profits at the level of each single supply basin; and (d) the endogenous value added was estimated to about 150 seasonal workers.
引用
收藏
页码:1121 / 1140
页数:20
相关论文
共 59 条
[41]   Analysing transport costs of Danish forest wood chip resources by means of continuous cost surfaces [J].
Moller, Bernd ;
Nielsen, Per S. .
BIOMASS & BIOENERGY, 2007, 31 (05) :291-298
[42]  
Neri F., 2007, Italia Forestale e Montana, V62, P385
[43]  
Panichelli L., 2008, ENVIRON MODELL SOFTW, V25, P702
[44]  
PARKER HD, 1988, PHOTOGRAMM ENG REM S, V54, P1547
[45]   Methodology based on Geographic Information Systems for biomass logistics and transport optimisation [J].
Perpina, C. ;
Alfonso, D. ;
Perez-Navarro, A. ;
Penalvo, E. ;
Vargas, C. ;
Cardenas, R. .
RENEWABLE ENERGY, 2009, 34 (03) :555-565
[46]   Multicriteria assessment in GIS environments for siting biomass plants [J].
Perpina, Carolina ;
Carlos Martinez-Llario, Jose ;
Perez-Navarro, Angel .
LAND USE POLICY, 2013, 31 :326-335
[47]  
Pistorius T, 2012, FOREST POLICY ECON, V18, P4, DOI [10.1016/j.forpol.2011.09.001, 10.1016/j.forpol.2012.03.001]
[48]  
Romano S., 2009, P ATT 3 C NAZ SELV T, P902
[49]  
Romano S., 2004, USO SISTEMI INFORM T, P613
[50]   Factors influencing nonindustrial private forest landowners' policy preference for promoting bioenergy [J].
Shivan, G. C. ;
Mehmood, Sayeed R. .
FOREST POLICY AND ECONOMICS, 2010, 12 (08) :581-588