Reliability Improved Stochastic Dynamic Programming for Reservoir Operation Optimization

被引:19
作者
Saadat, Mohsen [1 ]
Asghari, Keyvan [1 ]
机构
[1] Isfahan Univ Technol, Dept Civil Engn, Esfahan 8415683111, Iran
关键词
SDP; RISDP; Optimization; Reservoir operation; Reservoir simulation; MODEL; SIMULATION; SYSTEMS; STORAGE;
D O I
10.1007/s11269-017-1612-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Stochastic Dynamic Programming (SDP) is widely used in reservoir operation problems. Besides its advantages, a few drawbacks have leaded many studies to improve its structure. Handling the infeasible conditions and curse of dimensionality are two major challenges in this method. The main goal of this paper is proposing a new method to avoid infeasible conditions and enhance the solution efficiency with new discretization procedure. For this purpose, an optimization module is incorporated into regular SDP structure, so that, near optimal values of state variables are determined based on the available constraints. The new method (RISDP) employs reliability concept to maximize the reservoir releases to satisfy the downstream demands. Applying the proposed technique improves the reservoir operating policies compared to regular SDP policies with the same assumptions of discretization. Simulation of reservoir operation in a real case study indicates about 15% improvement in objective function value and elimination of infeasible conditions by using RISDP operating policies.
引用
收藏
页码:1795 / 1807
页数:13
相关论文
共 50 条
  • [41] Approximate stochastic dynamic programming for hydroelectric production planning
    Zephyr, Luckny
    Lang, Pascal
    Lamond, Bernard F.
    Cote, Pascal
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 586 - 601
  • [42] Technical Communication: Two-Phase Stochastic Dynamic Programming Model for Optimal Operation of Irrigation Reservoir
    N. V. Umamahesh
    P. Sreenivasulu
    [J]. Water Resources Management, 1997, 11 : 395 - 406
  • [43] DEVELOPMENT OF A FUZZY-MARKOV-BASED INTERVAL STOCHASTIC DYNAMIC PROGRAMMING MODEL FOR RESERVOIR OPERATION MANAGEMENT
    Fu, Dianzheng
    Li, Yongping
    Huang, Guohe
    Zhu, Ying
    [J]. ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2014, 13 (03): : 517 - 530
  • [44] A stochastic linear programming model for maximizing generation and firm output at a reliability in long-term hydropower reservoir operation
    Chen, Cheng
    Feng, Suzhen
    Liu, Shuangquan
    Zheng, Hao
    Zhang, Hong
    Wang, Jinwen
    [J]. JOURNAL OF HYDROLOGY, 2023, 618
  • [45] A Generalized Dynamic Programming Modelling Approach for Integrated Reservoir Operation
    Rani, Deepti
    Mourato, Sandra
    Moreira, Madalena
    [J]. WATER RESOURCES MANAGEMENT, 2020, 34 (04) : 1335 - 1351
  • [46] Coupled reservoir operation-irrigation scheduling by dynamic programming
    dos Santos Teixeira, A
    Mariño, MA
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2002, 128 (02) : 63 - 73
  • [47] Improving Dam and Reservoir Operation Rules Using Stochastic Dynamic Programming and Artificial Neural Network Integration Model
    Fayaed, Sabah Saadi
    Fiyadh, Seef Saadi
    Khai, Wong Jee
    Ahmed, Ali Najah
    Afan, Haitham Abdulmohsin
    Ibrahim, Rusul Khaleel
    Fai, Chow Ming
    Koting, Suhana
    Mohd, Nuruol Syuhadaa
    Jaafar, Wan Zurina Binti
    Hin, Lai Sai
    El-Shafie, Ahmed
    [J]. SUSTAINABILITY, 2019, 11 (19)
  • [48] RESERVOIR OPERATION USING HYBRID OPTIMIZATION ALGORITHMS
    Ho, V. H.
    Kougias, I.
    Kim, J. H.
    [J]. GLOBAL NEST JOURNAL, 2015, 17 (01): : 103 - 117
  • [49] Optimization of hedging rules for hydropower reservoir operation
    Sasireka, K.
    Neelakantan, T. R.
    [J]. SCIENTIA IRANICA, 2017, 24 (05) : 2242 - 2252
  • [50] Optimization of Conventional Rule Curves Coupled with Hedging Rules for Reservoir Operation
    Taghian, Mehrdad
    Rosbjerg, Dan
    Haghighi, Ali
    Madsen, Henrik
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (05) : 693 - 698