Integrating robust timetabling in line plan optimization for railway systems

被引:63
作者
Burggraeve, Sofie [1 ,2 ]
Bull, Simon Henry [1 ]
Vansteenwegen, Pieter [2 ]
Lusby, Richard Martin [1 ]
机构
[1] Tech Univ Denmark, Dept Management Engn, Prod Storvet DTU, Bldg 424, DK-2800 Lyngby, Denmark
[2] Katholieke Univ Leuven, Mobil Res Ctr CIB, Celestijnenlaan 300,Box 2422, B-3001 Leuven, Belgium
关键词
Railway line planning; Timetabling; Robustness; Mixed integer linear programming; PERFORMANCE; TIME;
D O I
10.1016/j.trc.2017.01.015
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger travel time and operator cost and for which a feasible and robust timetable exists. A line planning module and a timetabling module work iteratively and interactively. The line planning module creates an initial line plan. The timetabling module evaluates the line plan and identifies a critical line based on minimum buffer times between train pairs. The line planning module proposes a new line plan in which the time length of the critical line is modified in order to provide more flexibility in the schedule. This flexibility is used during timetabling to improve the robustness of the railway system. The algorithm is validated on the DSB S-tog network of Copenhagen, which is a high frequency railway system, where overtakings are not allowed. This network has a rather simple structure, but is constrained by limited shunt capacity. While the operator and passenger cost remain close to those of the initially and (for these costs) optimally built line plan, the timetable corresponding to the finally developed robust line plan significantly improves the minimum buffer time, and thus the robustness, in eight out of ten studied cases. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:134 / 160
页数:27
相关论文
共 30 条
[1]  
[Anonymous], 2011, TECHNICAL REPORT
[2]  
[Anonymous], OPERATIONS RES P 200
[3]  
[Anonymous], 2003, THESIS
[4]  
[Anonymous], P C ADV SYST PUBL TR
[5]  
[Anonymous], 2006, ATMOS 2005 5 WORKSH
[6]  
[Anonymous], 2008, RAILWAY TIMETABLE TR
[7]   An integrated micro-macro approach to robust railway timetabling [J].
Besinovic, Nikola ;
Goverde, Rob M. P. ;
Quaglietta, Egidio ;
Roberti, Roberto .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2016, 87 :14-32
[8]   A column-generation approach to line planning in public transport [J].
Borndoerfer, Ralf ;
Groetschel, Martin ;
Pfetsch, Marc E. .
TRANSPORTATION SCIENCE, 2007, 41 (01) :123-132
[9]   Optimal lines for railway systems [J].
Bussieck, MR ;
Kreuzer, P ;
Zimmermann, UT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (01) :54-63
[10]   A model predictive control approach for discrete-time rescheduling in complex central railway station areas [J].
Caimi, Gabrio ;
Fuchsberger, Martin ;
Laumanns, Marco ;
Luethi, Marco .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (11) :2578-2593