Hydro turbine prototype testing and generation of performance curves: Fully automated approach

被引:38
作者
Aggidis, George A. [1 ]
Zidonis, Audrius
机构
[1] Univ Lancaster, Renewable Energy Grp, Lancaster LA1 4YR, England
关键词
Renewable energy; Hydropower; Turbines; Turbine testing; Hill charts; Automation; SIMULATION;
D O I
10.1016/j.renene.2014.05.043
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents a technology that can accelerate the development of hydro turbines by fully automating the initial testing process of prototype turbine models and automatically converting the acquired data into efficiency hill charts that allow straight forward comparison of prototypes' performance. The testing procedure of both reaction and impulse turbines is illustrated using models of Francis and Felton turbines respectively. For the development of an appropriate hill chart containing no less than 780 points the average duration of the fully automated test is 4 h while the acquired data files can be processed into descriptive standard efficiency hill charts within less than a minute. These hill charts can then be used in research and development to quickly evaluate and compare the performance of initial turbine prototype designs before proceeding to much lengthier and more expensive development stage of the chosen design. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:433 / 441
页数:9
相关论文
共 29 条
[1]  
Aalto P, 2014, J COMMON MARK STUD
[2]  
Anagnostopoulos JS, 2012, PROCEEDINGS OF THE ASME 11TH BIENNIAL CONFERENCE ON ENGINEERING SYSTEMS DESIGN AND ANALYSIS, 2012, VOL 2, P157
[3]  
[Anonymous], 2004, GUIDE DEV SMALL HYDR
[4]  
[Anonymous], 1999, 60193 IEC
[5]  
Barstad LF, 2012, THESIS NORWEGIAN U S
[6]  
Boiten W., 1993, FLOW MEASURING STRUC
[7]  
British Hydropower Association (BHA), 2010, HYDR OPP CHALL SHAR
[8]  
Correa JLC, 2012, PROCEEDINGS OF THE ASME TURBO EXPO 2012, VOL 8, PTS A-C, P2039
[9]  
Correa JLC, 2012, ASME FLUID ENG DIV, P327
[10]  
Crewdson E., 1920, UK Patent, Patent No. [155,175 (A), 155175]