Research of Estimation of distribution algorithms on Joint optimal operation of cascade hydropower stations

被引:0
|
作者
Liang Chusheng [1 ]
Hu Yanlong [1 ]
Zhou Jia [1 ]
Gu Jiaping [1 ]
Mou Yindi [1 ]
机构
[1] Powerchina Chengdu Engn Corp Ltd, Chengdu 610031, Sichuan, Peoples R China
关键词
joint optimization operation; cascade hydropower stations; intelligent algorithm; Estimation of distribution algorithms (EDA);
D O I
10.1109/ICRIS.2019.00118
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The joint optimization operation of cascade hydropower stations has excellent performance in economic and social benefits. However, the connections between hydropower and power among cascaded hydropower stations are complex, and they are affected by many factors. In order to solve the multi-stage nonlinear optimization problem, this paper presents an intelligent algorithm and calculate example. The calculation results show that the intelligent algorithm has better performance, and has great application space in solving the joint optimization problem of cascade hydropower stations.
引用
收藏
页码:450 / 453
页数:4
相关论文
共 50 条
  • [1] Optimal short-term operation of a cascade of hydropower stations
    Wolf, AJ
    Lindberg, PO
    HYDRAULIC ENGINEERING SOFTWARE VI, 1996, : 215 - 221
  • [2] Research on ecological operation of three gorges cascade hydropower stations
    Li, Wei
    Wang, Xianjia
    Zhang, Liubo
    Information Technology Journal, 2013, 12 (24) : 8030 - 8034
  • [3] Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations
    Chen, Juan
    Zhong, Ping-an
    Zhao, Yun-fa
    ENERGY CONVERSION AND MANAGEMENT, 2014, 86 : 756 - 763
  • [4] Discussion on the monotonicity principle of the two-stage problem in joint optimal operation of cascade hydropower stations
    Wang, Chao
    Jiang, Zhiqiang
    Xu, Yichao
    Wang, Suiling
    Wang, Pengfei
    JOURNAL OF HYDROLOGY, 2023, 623
  • [5] Optimal operation of cascade hydropower stations using hydrogen as storage medium
    Lu, Di
    Wang, Bende
    Wang, Yaodong
    Zhou, Huicheng
    Liang, Qiuhua
    Peng, Yong
    Roskilly, Tony
    APPLIED ENERGY, 2015, 137 : 56 - 63
  • [6] Research on short-term optimization operation of cascade hydropower stations
    Xie, Hongsheng
    Wu, Xianglin
    Chen, Yang
    Zhao, Yong
    Ran, Guangcan
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (06): : 1 - 7
  • [7] Optimal operation model for cascade hydropower stations in multiple power generation subjects
    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China
    Huazhong Ligong Daxue Xuebao, 2008, 7 (60-62):
  • [8] Evaluation on Operation Management of Cascade Hydropower Stations
    Zheng, Y.
    Fu, X. D.
    Wei, J. H.
    Li, X.
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 146 - 150
  • [9] Three Gorges Cascade Hydropower System Joint Simulative Optimal Operation Research in Power Market
    Zheng, Jiao
    Yang, Kan
    Zhou, Ran
    Hao, Yonghuai
    Liu, Guoshuai
    RENEWABLE AND SUSTAINABLE ENERGY, PTS 1-7, 2012, 347-353 : 1370 - +
  • [10] Joint Optimal Operation of Wind Power Plant and Cascade Hydropower Station
    Jiang, Di
    Wang, Mingkai
    Sun, Wentao
    Wu, Yang
    2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632