Integrated Set Parts Supply system in a mixed-model assembly line

被引:19
|
作者
Jainury, Suhartini Mohd [1 ,3 ]
Ramli, Rizauddin [1 ]
Ab Rahmana, Mohd Nizam [1 ]
Omar, Azhari [2 ]
机构
[1] Univ Kebangsaan Malaysia, Fac Engn & Built Environm, Dept Mech & Mat Engn, Bangi 43600, Selangor, Malaysia
[2] GICT Proton, Dept Mfg Solut, Shah Alam 40918, Selangor, Malaysia
[3] Politekn Sultan Azlan Shah, Dept Mech Engn, Behrang 35950, Perak, Malaysia
关键词
Assembly line; e-kanban; Just In Time; Kitting; Manufacturing Execution System; ORDER PICKING; DESIGN;
D O I
10.1016/j.cie.2014.07.008
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The mixed-model assembly line (MMAL) is a type of assembly line in which a variety of product models are assembled on the same line. The use of highly variant parts on the assembly line need to be considered carefully to enable satisfactory material flow control and allow for smooth production. To increase the quality of parts supply and parts assembly in MMAL, Toyota has introduced an innovation system known as Set Parts Supply (SPS). In this paper, we investigate the parts supply issues in SPS implementation using a case study in the automotive industry. The linkage of parts supply strategies with Manufacturing Execution System (MES) is introduced to improve the SPS implementation which are (i) synchronized parts supply, (ii) e-kanban system and (iii) Synchronized Supply Sheet. From the research findings, the integration with MES has contributed to the Just In Time in parts supply at the supermarket area and assembly line. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:266 / 273
页数:8
相关论文
共 50 条
  • [41] An Implementation of Set Parts Supply System in the Malaysian Automotive Industry
    Jainury, Suhartini Mohd
    Ramli, Rizauddin
    Ab Rahman, Mohd Nizam
    Omar, Azhari
    JURNAL TEKNOLOGI, 2012, 59
  • [42] Mixed-model multi-manned assembly line balancing problem: a mathematical model and a simulated annealing approach
    Roshani, Abdolreza
    Nezami, Farnaz Ghazi
    ASSEMBLY AUTOMATION, 2017, 37 (01) : 34 - 50
  • [43] A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem
    A. R. Rahimi-Vahed
    S. M. Mirghorbani
    M. Rabbani
    Soft Computing, 2007, 11 : 997 - 1012
  • [44] A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem
    Rahimi-Vahed, A. R.
    Mirghorbani, S. M.
    Rabbani, M.
    SOFT COMPUTING, 2007, 11 (10) : 997 - 1012
  • [45] Integrated process planning and system configuration for mixed-model machining on rotary transfer machine
    Battaia, Olga
    Dolgui, Alexandre
    Guschinsky, Nikolai
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2017, 30 (09) : 910 - 925
  • [46] Production planning of mixed-model assembly lines: overview and extensions
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    PRODUCTION PLANNING & CONTROL, 2009, 20 (05) : 455 - 471
  • [47] Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines
    Emde, Simon
    Boysen, Nils
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (01) : 393 - 402
  • [48] Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human-robot collaboration
    Cil, Zeynel Abidin
    Li, Zixiang
    Mete, Suleyman
    Ozceylan, Eren
    APPLIED SOFT COMPUTING, 2020, 93
  • [49] Evaluation of mixed-model U-line operational designs
    Hong, Yunsook
    Visich, John K.
    Pinto, Peter A.
    Khumawala, Basheer M.
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2013, 20 (06) : 917 - 936
  • [50] Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
    Babak Javadi
    Alireza Rahimi-Vahed
    Masoud Rabbani
    Mostafa Dangchi
    The International Journal of Advanced Manufacturing Technology, 2008, 39 : 975 - 982