PREDICTING PROJECT SUCCESS IN CONSTRUCTION USING AN EVOLUTIONARY GAUSSIAN PROCESS INFERENCE MODEL

被引:26
|
作者
Cheng, Min-Yuan [1 ]
Huang, Chin-Chi [1 ]
Van Roy, Andreas Franskie [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Taipei, Taiwan
关键词
Gaussian process; particle swarm optimization; Bayesian inference; project success; CAPP; EGPIM;
D O I
10.3846/13923730.2013.801919
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There are many factors that affect the success of the implementation process of a project. The importance of each of these factors varies according to the different phases of the project lifecycle, which makes it very difficult to predict the final result of a project. In practice, foreseeing the result of a project is based on the judgment of those in management, which is grounded in their experience. This study aimed to build an Evolutionary Gaussian Process Inference Model (EGPIM), using a Gaussian process, along with Bayesian inference and particle swarm optimization, which helps to optimize the hyper-parameters required for making Gaussian process predictions. With this model at its core, this study can efficiently extract expert knowledge and experience from case studies and historical data to determine relationships between factors which significantly influence the outcome of a project so that its success may be predicted. Historical cases were ordered as a time series based on the Continuous Assessment of Project Performance (CAPP) research results. The model was trained using the EGPIM and these cases to predict the success of a project. This model proved quite accurate at predicting the success of a project and had outstanding performance in time-series applications.
引用
收藏
页码:S202 / S211
页数:10
相关论文
共 50 条
  • [21] Which Process Model Practices Support Project Success?
    Lepmets, Marion
    SYSTEMS, SOFTWARE AND SERVICES PROCESS IMPROVEMENT, 2010, 99 : 119 - 129
  • [22] Optimizing claim management process groups to enhance construction project success
    Abdelalim, Ahmed Mohammed
    Salem, Mohamed
    Al-Sabah, Ruqaya
    Said, Salah Omar
    Elshafei, Hisham Mahmoud
    Badawy, Mohamed Galal
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2025,
  • [23] Development of a comprehensive model for construction project success evaluation by contractors
    Heravi, Gholamreza
    Ilbeigi, Mohammad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (05) : 526 - +
  • [24] Predicting Encounters in Opportunistic Networks using Gaussian Process
    Chilipirea, Cristian
    Petre, Andreea-Cristina
    Dobre, Ciprian
    19TH INTERNATIONAL CONFERENCE ON CONTROL SYSTEMS AND COMPUTER SCIENCE (CSCS 2013), 2013, : 99 - 105
  • [25] Evolutionary fuzzy hybrid neural network for dynamic project success assessment in construction industry
    Cheng, Min-Yuan
    Tsai, Hsing-Chih
    Sudjono, Erick
    AUTOMATION IN CONSTRUCTION, 2012, 21 : 46 - 51
  • [26] ON THE SUCCESS OF NETWORK INFERENCE USING A MARKOV ROUTING MODEL
    Balzano, Laura
    Nowak, Robert
    Roughan, Matthew
    2011 IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH, AND SIGNAL PROCESSING, 2011, : 3108 - 3111
  • [27] Local Gaussian Process Model Inference Classification for Time Series Data
    Berns, Fabian
    Strueber, Joschka Hannes
    Beecks, Christian
    33RD INTERNATIONAL CONFERENCE ON SCIENTIFIC AND STATISTICAL DATABASE MANAGEMENT (SSDBM 2021), 2020, : 209 - 213
  • [28] Developing a project performance assessment model for benchmarking the project success of Indian construction projects
    Ingle, Prachi Vinod
    Gangadhar, Mahesh
    Deepak, M. D.
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2024, 31 (05) : 1426 - 1452
  • [29] Multicriteria construction project scheduling method using evolutionary algorithm
    Piotr Jaskowski
    Anna Sobotka
    Operational Research, 2006, 6 (3) : 283 - 297
  • [30] Predicting productivity loss caused by change orders using the evolutionary fuzzy support vector machine inference model
    Cheng, Min-Yuan
    Wibowo, Dedy Kurniawan
    Prayogo, Doddy
    Roy, Andreas F. V.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (07) : 881 - 892