Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers

被引:21
|
作者
Wang, Xiuli [2 ]
Cheng, T. C. E. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[2] Nanjing Univ Sci & Technol, Sch Econ Management, Nanjing 210094, Peoples R China
关键词
Machine scheduling; Job class setup; Transportation; Heuristics; SINGLE-MACHINE; TIMES; COMPLEXITY;
D O I
10.1016/j.ijpe.2009.02.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the identical parallel-machine scheduling problem in which both job class setups for job processing and product delivery are required. A setup time is incurred for a job if it is the first job to be processed oil a machine or its processing on a machine follows a job that belongs to another class. Processed jobs are delivered in batches to their respective customers. The batch size is limited by the capacity of the delivery vehicles and each shipment incurs a delivery (transportation) cost and takes a fixed amount of time. The objective is to minimize the weighted sum of the last arrival time of the jobs to the customers and the delivery cost. We develop heuristics for the problem and analyse their performance bounds. (C) 2009 Elsevier B.V. All rights reserved
引用
收藏
页码:199 / 206
页数:8
相关论文
共 50 条
  • [41] Online Scheduling of Incompatible Family Jobs with Equal Length on an Unbounded Parallel-Batch Machine with Job Delivery
    Liu, Qijia
    Yuan, Jinjiang
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (04)
  • [42] Heuristics to maximize system availability on parallel machine scheduling Problem
    Khoudi, Asmaa
    Berrichi, Ali
    Yalaoui, Farouk
    2015 12th IEEE International Conference on Programming and Systems (ISPS), 2015, : 264 - 269
  • [43] Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times
    Ghaith Rabadi
    Reinaldo J. Moraga
    Ameer Al-Salem
    Journal of Intelligent Manufacturing, 2006, 17 : 85 - 97
  • [44] Heuristics for the unrelated parallel machine scheduling problem with setup times
    Rabadi, G
    Moraga, RJ
    Al-Salem, A
    JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (01) : 85 - 97
  • [45] Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities
    Hsu, Chou-Jung
    Ji, Min
    Guo, Jia-Yuarn
    Yang, Dar-Li
    INFORMATION SCIENCES, 2013, 253 : 163 - 169
  • [46] Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
    Yeh, Wei-Chang
    Lai, Peng-Jen
    Lee, Wen-Chiung
    Chuang, Mei-Chi
    INFORMATION SCIENCES, 2014, 269 : 142 - 158
  • [47] Exact and heuristic algorithms for parallel-machine scheduling with DeJong's learning effect
    Okolowski, Dariusz
    Gawiejnowicz, Stanislaw
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (02) : 272 - 279
  • [48] Effective IG heuristics for a single-machine scheduling problem with family setups and resource constraints
    Pinheiro, Julio C. S. N.
    Arroyo, Jose Elias C.
    ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2020, 88 (1-3) : 169 - 185
  • [49] Imperialist competitive algorithm for unrelated parallel machine scheduling with sequence-and-machine-dependent setups and compatibility and workload constraints
    Elyasi, Milad
    Selcuk, Yagmur Selenay
    Ozener, O. Orsan
    Coban, Elvin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 190
  • [50] Comparative Analysis of Mixed Integer Programming Formulations for Single-Machine and Parallel-Machine Scheduling Problems
    Ying, Kuo-Ching
    Cheng, Chen-Yang
    Lin, Shih-Wei
    Hung, Chia-Yang
    IEEE ACCESS, 2019, 7 : 152998 - 153011