Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

被引:9
|
作者
Zhao, Mingji [1 ]
Cheng, Yun [2 ,3 ]
Song, Zhanping [2 ,3 ]
Wang, Tong [2 ,3 ]
Zhang, Yuwei [2 ,3 ]
Gong, Yitong [2 ]
Song, Yuncai [4 ]
机构
[1] Xian Univ Architecture & Technol, Sch Mech & Elect Engn, Xian 710055, Peoples R China
[2] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Peoples R China
[3] Shaanxi Key Lab Geotech & Underground Space Engn, Xian 710055, Peoples R China
[4] China Railway Construct Bridge Engn Bur Grp Co Lt, Tianjin 300300, Peoples R China
关键词
D O I
10.1155/2021/6674862
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
During the construction of the underpass of a new tunnel, the excavation unloading effect disturbs surrounding rock masses and promotes surrounding rock deformation, inevitably changing stress and displacement in the existing tunnel. Taking Yangtaishan tunnel excavation of Shenzhen Metro Line 6 as an engineering example, effects of excavation programs of left and right lines on the deformation characteristics of newly excavated and existing tunnels were evaluated based on Midas numerical model and priority excavation advantages of the left line were determined. The settlement and horizontal deformation characteristics of the existing tunnel were analyzed using the construction monitoring method. Results showed that maximum settlement and horizontal deformation of the existing tunnel were 1.35 and 0.23 mm, respectively. Settlement of invert and inverted top along axis direction was from growth to decline, and then a V-shaped settlement trough was formed with maximum settlement values of 1.36 and 0.97 mm, respectively. Maximum settlement and uplift of the newly built tunnel appeared on the upper and bottom parts of invert, respectively. In the newly built tunnel segments, the top settlement was dominated and deformation was mainly distributed in both side areas. At the top of the existing tunnel segment, convergence settlement was 3.09 mm and settlement rate was slow first which was accelerated, then stabilized, and finally slowed down again which was opposite to the uplift development trend of the bottom of tunnel segment. The top of the existing tunnel segment showed four settlement stages, slow, rapid, stable, and slow settlement stages. Compared with the right line, preferential excavation of the left line had obvious advantages in terms of tunnel stability. The unloading effect of TBM excavation created vault settlement in the existing tunnels where actual settlement values were 1.12 and 1.13 times, which theoretically calculated settlement. The horizontal deformation of the existing tunnel was varied first linearly and then nonlinearly with maximum deformation in the convergence stage of 1.47 mm.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Modeling and analysis of traction network of high-speed railway tunnel/viaduct sections
    Zhang, Gui-Nan
    Liu, Zhi-Gang
    Guo, Xiao-Xu
    Gao, Shi-Bin
    Tiedao Xuebao/Journal of the China Railway Society, 2015, 37 (11): : 16 - 24
  • [32] Aerodynamic load and structure stress analysis on hood of high-speed railway tunnel
    Wang Y.
    Gao B.
    Ren W.
    2017, Chinese Society of Theoretical and Applied Mechanics (49): : 48 - 54
  • [33] Inversion Analysis of Mechanical Parameters of Surrounding Rock in High-speed Railway Tunnel
    Wang, Hao
    Chang, Xiangyu
    Zhang, Yiming
    Liang, Ruijun
    Wang, Feiqiu
    Tao, Lei
    Li, Zhaozhong
    Journal of Railway Engineering Society, 2020, 37 (09) : 47 - 53
  • [34] Study on Foam Concrete Damping Measure for Crossing High-Speed Railway tunnel
    Huo, Fei
    Liu, Hai-Lin
    Peng, Li-Min
    PROCEEDINGS OF THE 2015 2ND INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS ENGINEERING, CHEMICAL ENGINEERING AND BIOTECHNOLOGY (MMECEB), 2016, 49 : 343 - 347
  • [35] A Geotechnical Perspective on a Complex Geological Environment in a High-Speed Railway Tunnel Excavation (A Case Study from Turkiye)
    Gokceoglu, Candan
    Aygar, Ebu Bekir
    Nefeslioglu, Hakan A. A.
    Karahan, Servet
    Gullu, Suat
    INFRASTRUCTURES, 2022, 7 (11)
  • [36] STUDY OF EXCAVATION METHODS OF HIGH-SPEED RAILWAY TUNNEL IN THE WEAK SURROUNDING ROCK
    Zhu, Haobo
    Sun, Feng
    Zhang, Dingli
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 873 - 876
  • [38] Characteristics, challenges and countermeasures of giant karst cave: A case study of Yujingshan tunnel in high-speed railway
    Zheng, Yuchao
    He, Siyue
    Yu, Yu
    Zheng, Jieyuan
    Zhu, Yong
    Liu, Tong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 114
  • [39] Wind Tunnel Test of Wind Load on a Typical Cross Line High-Speed Railway Station
    Zhao, Lei
    Yu, Zhixiang
    Qi, Xin
    Xu, Hu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (10) : 3779 - 3787
  • [40] Wind Tunnel Test of Wind Load on a Typical Cross Line High-Speed Railway Station
    Lei Zhao
    Zhixiang Yu
    Xin Qi
    Hu Xu
    KSCE Journal of Civil Engineering, 2021, 25 : 3779 - 3787