Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam

被引:9
|
作者
Wu, Xiangye [1 ]
Wang, Shuai [1 ]
Tian, Chen [2 ]
Ji, Changxing [3 ]
Wang, Jingya [1 ]
机构
[1] Inner Mongolia Univ Sci & Technol, Inst Min Engn, Baotou 014010, Peoples R China
[2] Shenhua Shendong Coal Grp Corp Ltd, Bulianta Coal Mine, Ordos 017209, Peoples R China
[3] Inner Mongolia Fucheng Min Co Ltd, Ordos 016217, Peoples R China
基金
中国国家自然科学基金;
关键词
BEHAVIOR; STRESS;
D O I
10.1155/2020/8871925
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
In view of multiseam mining under goaf, the surrounding rock control problem of lower coal roadway will be affected by concentrated coal pillar left in upper coal seam goaf and dynamic pressure superposition of working face in this coal seam. Under the geological environment of No. 16 extrathick coal seam in the Laoshidan coal mine and taking the working face 031604 as the research background, the reasonable docking position selection of the withdrawal roadway and the docking roadway in the middle mining period and the surrounding rock stability control problems of the withdrawal roadway and the docking roadway during the final mining period were studied by using the methods of field theoretical analysis, numerical simulation, and field measurement. The mechanical mechanism of the nonuniform failure of the retreating roadway and the docking roadway during the final mining period is shown, and the control method of the surrounding rock stability of the roadway is put forward and applied. The results show that (1) through the analysis of the superimposed stress under the concentrated coal pillar and the coal seam in advance, the specific butt joint position is arranged at 860 m away from the open-off cut, which is 10 m away from the goaf of No. 12 coal seam. (2) With the working face 031604 advancing through the process, the deviatoric stress value of the withdrawal roadway gradually increases, the maximum principal stress of the two sides of the roadway deflects clockwise from the vertical direction to the horizontal direction, its angle also gradually increases, and the shape of the plastic zone gradually expands from symmetry to asymmetry. (3) It is revealed that the peak value of deviatoric stress on both sides of the docking position of docking roadway increases gradually under the influence of mining and deflects anticlockwise to the vertical direction with the principal stress angle. The joint action of both is the mechanical mechanism that causes the plastic zone to expand in an asymmetric shape. (4) The coordinated control scheme of support (anchor bolt and anchor cable)-modified (grouting)-is adopted for the withdrawal roadway, and the coordinated control scheme of support (anchor bolt and anchor cable)-changing the cross-section shape of the roadway-is adopted for the docking roadway. The purpose of the smooth connection of working face and rapid and safe withdrawal of equipment is achieved on site.
引用
收藏
页数:16
相关论文
共 50 条
  • [11] Failure Mechanism and Control of Surrounding Rock of Mining Roadway Under Overlying Goaf
    Yang, Jiyuan
    Dong, Junliang
    Lv, Kun
    Bi, Zhongwei
    Fu, Xingyu
    Zhao, Bin
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (03) : 1607 - 1618
  • [12] Study on Failure Characteristics and Control Technology of Roadway Surrounding Rock under Repeated Mining in Close-Distance Coal Seam
    Shang, Yuqi
    Kong, Dezhong
    Pu, Shijiang
    Xiong, Yu
    Li, Qiang
    Cheng, Zhanbo
    MATHEMATICS, 2022, 10 (13)
  • [13] Failure Mechanism and Control of Surrounding Rock of Mining Roadway Under Overlying Goaf
    Jiyuan Yang
    Junliang Dong
    Kun Lv
    Zhongwei Bi
    Xingyu Fu
    Bin Zhao
    Geotechnical and Geological Engineering, 2022, 40 : 1607 - 1618
  • [14] Instability and failure characteristics of surrounding rock of water drenching roadway in thick coal seam
    Jia, Ce
    Li, Sheng
    Fan, Chaojun
    Luo, Mingkun
    Yang, Zhenhua
    Yang, Lei
    Pu, Ziang
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [15] Failure mechanism of Mesozoic soft rock roadway in Shajihai coal mine and its surrounding rock control
    Yuan Yue
    Zhu Yongjian
    Wang Weijun
    Yu Weijian
    InternationalJournalofMiningScienceandTechnology, 2014, 24 (06) : 853 - 858
  • [16] Failure mechanism of Mesozoic soft rock roadway in Shajihai coal mine and its surrounding rock control
    Yue, Yuan
    Zhu Yongjian
    Wang Weijun
    Yu Weijian
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2014, 24 (06) : 853 - 858
  • [18] Study on the Stage Failure Mechanism and Stability Control of Surrounding Rock of Repeated Mining Roadway
    Wu, Xiangye
    Wang, Jingya
    Wang, Wencai
    Tian, Chen
    Bu, Qingwei
    Wu, Lin
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [19] Failure mechanism and stability control technology of rock surrounding a roadway in complex stress conditions
    Yu Yang ab Bai Jianbiao ab Chen Ke c Wang Xiangyu ab Xiao Tongqiang ab Chen Yong ab a School of Mines China University of Mining Technology Xuzhou China b State Key Laboratory of Coal Resources and Mine Safety China University of Mining Technology Xuzhou China c Baoji Coal Industry Corporation Ltd Baoji China
    MiningScienceandTechnology, 2011, 21 (03) : 301 - 306
  • [20] Surrounding rock control optimal design of large section roadway in soft coal seam
    Liu, Jin-Rong
    Kang, Qing-Tao
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2013, 30 (06): : 836 - 840