Discrete time model and algorithms for container yard crane scheduling

被引:100
|
作者
Li, Wenkai [1 ]
Wu, Yong [1 ]
Petering, M. E. H. [1 ,2 ]
Goh, Mark [1 ]
de Souza, Robert [1 ]
机构
[1] Asia Pacific, Logist Inst, Singapore 117574, Singapore
[2] Univ Wisconsin, Dept Ind & Mfg Engn, Milwaukee, WI 53201 USA
关键词
Scheduling; Rolling-horizon algorithm; Container yard; MILP; OPERATIONS-RESEARCH; ALLOCATION; SEARCH;
D O I
10.1016/j.ejor.2008.08.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT's throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fixed YC separation distances and simultaneous container storage/retrievals. Among them, only inter-crane interference has ever been considered in the literature. The model requires far fewer integer variables than the literature by using bi-index decision variables. We show how the model can be solved quickly using heuristics and rolling-horizon algorithm, yielding close to optimal solutions in seconds. The solution quality and solution time are both better than the literature even with additional constraints considered. The proposed formulations and algorithms can be extended to other problems with time windows and space constraints. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:165 / 172
页数:8
相关论文
共 50 条
  • [41] A discrete time model for storage and scheduling operations in container terminal
    Kouismi, Sanae
    Benabbou, Loubna
    Sbihi, Najiba
    PROCEEDINGS OF THE 3RD IEEE INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT (GOL'16), 2016,
  • [42] Yard Crane Scheduling Method Based on Deep Reinforcement Learning for the Automated Container Terminal
    Wang W.
    Huang Z.
    Zhuang Z.
    Fang H.
    Qin W.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2024, 60 (06): : 44 - 57
  • [43] Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals
    Guo, Xi
    Huang, Shell Ying
    TRANSPORTATION SCIENCE, 2012, 46 (01) : 134 - 148
  • [44] An exact method for scheduling a yard crane
    Gharehgozli, Amir Hossein
    Yu, Yugang
    de Koster, Rene
    Udding, Jan Tijmen
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (02) : 431 - 447
  • [45] Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption
    He, Junliang
    Huang, Youfang
    Yan, Wei
    ADVANCED ENGINEERING INFORMATICS, 2015, 29 (01) : 59 - 75
  • [46] Container Assignment and Yard Crane Deployment in a Container Terminal: A Case Study
    Nang Laik
    Eleni Hadjiconstantnou
    Maritime Economics & Logistics, 2008, 10 (1-2) : 90 - 107
  • [47] Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
    Hsu, Hsien-Pin
    Wang, Chia-Nan
    Fu, Hsin-Pin
    Dang, Thanh-Tuan
    MATHEMATICS, 2021, 9 (18)
  • [48] Performing A* Search for Yard Crane Dispatching in Container Terminals
    Guo, Xi
    Huang, Shell Ying
    20TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, VOL 1, PROCEEDINGS, 2008, : 263 - 267
  • [49] A heuristic for dynamic yard crane deployment in a container terminal
    Linn, RJ
    Zhang, CQ
    IIE TRANSACTIONS, 2003, 35 (02) : 161 - 174
  • [50] Model and algorithm for yard crane scheduling problem in a mixed stacking block
    Wang, Zhan
    Lu, Zhi-Qiang
    Pan, Er-Shun
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2012, 32 (01): : 182 - 188