Discrete time model and algorithms for container yard crane scheduling

被引:100
|
作者
Li, Wenkai [1 ]
Wu, Yong [1 ]
Petering, M. E. H. [1 ,2 ]
Goh, Mark [1 ]
de Souza, Robert [1 ]
机构
[1] Asia Pacific, Logist Inst, Singapore 117574, Singapore
[2] Univ Wisconsin, Dept Ind & Mfg Engn, Milwaukee, WI 53201 USA
关键词
Scheduling; Rolling-horizon algorithm; Container yard; MILP; OPERATIONS-RESEARCH; ALLOCATION; SEARCH;
D O I
10.1016/j.ejor.2008.08.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT's throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fixed YC separation distances and simultaneous container storage/retrievals. Among them, only inter-crane interference has ever been considered in the literature. The model requires far fewer integer variables than the literature by using bi-index decision variables. We show how the model can be solved quickly using heuristics and rolling-horizon algorithm, yielding close to optimal solutions in seconds. The solution quality and solution time are both better than the literature even with additional constraints considered. The proposed formulations and algorithms can be extended to other problems with time windows and space constraints. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:165 / 172
页数:8
相关论文
共 50 条
  • [21] Yard crane scheduling at container terminals: A comparative study of centralized and decentralized approaches
    Omor Sharif
    Nathan Huynh
    Maritime Economics & Logistics, 2012, 14 : 139 - 161
  • [22] Yard Crane Scheduling with Real-time Reshuffle
    Man, Xiaoyi
    Zheng, Feifeng
    Chu, Feng
    Xu, Yinfeng
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 225 - 230
  • [23] Load Scheduling of Multiple Yard Crane Systems in Container Terminal with Buffer Areas
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 70 - 77
  • [24] Yard crane scheduling problem in a container terminal considering risk caused by uncertainty
    He, Junliang
    Tan, Caimao
    Zhang, Yuting
    ADVANCED ENGINEERING INFORMATICS, 2019, 39 : 14 - 24
  • [25] Yard crane scheduling at container terminals: A comparative study of centralized and decentralized approaches
    Sharif, Omor
    Huynh, Nathan
    MARITIME ECONOMICS & LOGISTICS, 2012, 14 (02) : 139 - 161
  • [26] A quay crane scheduling method considering interference of yard cranes in container terminals
    Jung, Da Hun
    Park, Young-Man
    Lee, Byung Kwon
    Kim, Kap Hwan
    Ryu, Kwang Ryel
    MICAI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4293 : 461 - +
  • [27] Yard Crane Scheduling in the Ground Trolley-Based Automated Container Terminal
    Yang, Xiao-Ming
    Jiang, Xin-Jia
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2020, 37 (02)
  • [28] Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals
    Liu, Wenqian
    Zhu, Xiaoning
    Wang, Li
    Yan, Baicheng
    Zhang, Xuewei
    JOURNAL OF ADVANCED TRANSPORTATION, 2021, 2021
  • [29] Development of automatic container yard crane
    Obata, K.
    Kobayashi, M.
    Miyata, N.
    Nishioka, M.
    Yoshikawa, H.
    Technical Review - Mitsubishi Heavy Industries, 2001, 38 (02): : 62 - 66
  • [30] YARD CRANE DEPLOYMENT IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Lau, Meimei
    Tay, Teck Chin
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1735 - 1746