Effectiveness of water infrastructure for river flood management - Part 1: Flood hazard assessment using hydrological models in Bangladesh

被引:11
作者
Gusyev, M. A. [1 ,4 ]
Kwak, Y. [1 ,4 ]
Khairul, M. I. [2 ]
Arifuzzaman, M. B. [2 ]
Magome, J. [3 ]
Sawano, H. [1 ]
Takeuchi, K. [1 ,4 ]
机构
[1] UNESCO, Int Ctr Water Hazard & Risk Management ICHARM Aus, PWRI, Tsukuba, Ibaraki, Japan
[2] Bangladesh Water Dev Board, Dhaka, Bangladesh
[3] Univ Yamanashi, Interdisciplinary Grad Sch Med & Engn, Int Res Ctr River Basin Environm ICRE, Kofu, Yamanashi, Japan
[4] Natl Grad Inst Policy Studies GRIPS, Tokyo, Japan
来源
CHANGES IN FLOOD RISK AND PERCEPTION IN CATCHMENTS AND CITIES | 2015年 / 370卷
关键词
D O I
10.5194/piahs-370-75-2015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study introduces a flood hazard assessment part of the global flood risk assessment (Part 2) conducted with a distributed hydrological Block-wise TOP (BTOP) model and a GIS-based Flood Inundation Depth (FID) model. In this study, the 20 km grid BTOP model was developed with globally available data on and applied for the Ganges, Brahmaputra and Meghna (GBM) river basin. The BTOP model was calibrated with observed river discharges in Bangladesh and was applied for climate change impact assessment to produce flood discharges at each BTOP cell under present and future climates. For Bangladesh, the cumulative flood inundation maps were produced using the FID model with the BTOP simulated flood discharges and allowed us to consider levee effectiveness for reduction of flood inundation. For the climate change impacts, the flood hazard increased both in flood discharge and inundation area for the 50- and 100-year floods. From these preliminary results, the proposed methodology can partly overcome the limitation of the data unavailability and produces flood maps that can be used for the nationwide flood risk assessment, which is presented in Part 2 of this study.
引用
收藏
页码:75 / 81
页数:7
相关论文
共 16 条
[1]  
[Anonymous], 2012, COPING WATER SCARCIT
[2]  
[Anonymous], J JAPAN SOC HYDROLOG
[3]  
BWDB-Bangladesh Water Development Board, OBS RIV DAT REP 1988
[4]  
EOS-Earth Observing System Data Gateway, 2006, NASA EARTH OBS SYST
[5]  
Harris I., 2008, CRU TIM SER TS HIGH
[6]  
IWM-Institute of Water Modelling, 2006, UPD VAL N W REG MOD
[7]   Hydrological Modeling of Large river Basins: How Much is Enough? [J].
Johnston, Robyn ;
Smakhtin, Vladimir .
WATER RESOURCES MANAGEMENT, 2014, 28 (10) :2695-2730
[8]   A new approach to flood risk assessment in Asia-Pacific region based on MRI-AGCM outputs [J].
Kwak, Youngjoo ;
Takeuchi, Kuniyoshi ;
Fukami, Kazuhiko ;
Magome, Jun .
HYDROLOGICAL RESEARCH LETTERS, 2012, 6 :70-75
[9]  
Lehner B., 2008, Eos Trans. AGU, DOI DOI 10.1029/2008EO100001
[10]   Model study of the impacts of future climate change on the hydrology of Ganges-Brahmaputra-Meghna basin [J].
Masood, M. ;
Yeh, P. J. -F. ;
Hanasaki, N. ;
Takeuchi, K. .
HYDROLOGY AND EARTH SYSTEM SCIENCES, 2015, 19 (02) :747-770