GA-based multicriteria optimal model for construction scheduling

被引:165
|
作者
Leu, SS [1 ]
Yang, CH [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Constr Engn, Taipei 10672, Taiwan
关键词
D O I
10.1061/(ASCE)0733-9364(1999)125:6(420)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Resources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria computational optimal scheduling model, which integrates the time/cost trade-off model, resource-limited model, and resource leveling model, is proposed. A searching technique using genetic algorithms (GAs) is adopted in the model. Furthermore, the nondominated solutions are found by the multiple attribute decision-making method, technique for order preference by similarity to ideal solution. The model can effectively provide the optimal combination of construction durations, resource amounts, minimum direct project costs, and minimum project duration under the constraint of Limited resources.
引用
收藏
页码:420 / 427
页数:8
相关论文
共 50 条
  • [31] GA-based discrete dynamic programming approach for scheduling in FMS environments
    Yang, JB
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2001, 31 (05): : 824 - 835
  • [32] A GA-based Scheduling Algorithm for Battery-powered DVS Systems
    Jiang, Songling
    Ding, Shan
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 3208 - 3212
  • [33] GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction Materials
    Koo, Kyo-Jin
    Park, Sung-Chul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (06): : 725 - 732
  • [34] Operations Scheduling in Make-and-Pack Production: Schedule Construction and GA-based Priority-Rule Generation Procedures
    Baumann, Philipp
    Trautmann, Norbert
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 454 - 458
  • [35] GA-based resource-constrained flow-shop scheduling model for mixed precast production
    Leu, SS
    Hwang, ST
    AUTOMATION IN CONSTRUCTION, 2002, 11 (04) : 439 - 452
  • [36] System approximation via GA-based fuzzy model
    Teng, YW
    Wang, WJ
    APCCAS 2002: ASIA-PACIFIC CONFERENCE ON CIRCUITS AND SYSTEMS, VOL 2, PROCEEDINGS, 2002, : 547 - 550
  • [37] GATS 1.0: A novel GA-based scheduling algorithm for task scheduling on heterogeneous processor nets
    Daoud, Mohammad
    Kharma, Nawwaf
    GECCO 2005: Genetic and Evolutionary Computation Conference, Vols 1 and 2, 2005, : 2209 - 2210
  • [38] On optimal design of passive suspension using GA-based heuristic method
    Jabeen S.D.
    Mukherjee R.N.
    Saha J.
    International Journal of Materials and Structural Integrity, 2010, 4 (01) : 59 - 86
  • [39] GA-based Optimal Power Flow for Microgrids with DC Distribution Network
    Farasat, Mehdi
    Mehraeen, Shahab
    Arabali, Amirsaman
    Trzynadlowski, Andrzej
    2015 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), 2015, : 3372 - 3379
  • [40] Secure and Task Abortion Aware GA-Based Hybrid Metaheuristics for Grid Scheduling
    Kolodziej, Joanna
    Xhafa, Fatos
    Bogdanski, Marcin
    PARALLEL PROBLEMS SOLVING FROM NATURE - PPSN XI, PT I, 2010, 6238 : 526 - +