GA-based multicriteria optimal model for construction scheduling

被引:165
|
作者
Leu, SS [1 ]
Yang, CH [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Constr Engn, Taipei 10672, Taiwan
关键词
D O I
10.1061/(ASCE)0733-9364(1999)125:6(420)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Resources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria computational optimal scheduling model, which integrates the time/cost trade-off model, resource-limited model, and resource leveling model, is proposed. A searching technique using genetic algorithms (GAs) is adopted in the model. Furthermore, the nondominated solutions are found by the multiple attribute decision-making method, technique for order preference by similarity to ideal solution. The model can effectively provide the optimal combination of construction durations, resource amounts, minimum direct project costs, and minimum project duration under the constraint of Limited resources.
引用
收藏
页码:420 / 427
页数:8
相关论文
共 50 条
  • [21] NBA Sports Game Scheduling Problem and GA-based Solver
    Yang, Feng-Cheng
    2017 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATION (ICIMSA 2017), 2017, : 10 - 14
  • [22] A hybrid GA-based scheduling algorithm for heterogeneous computing environments
    Yu, Han
    2007 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING, 2007, : 87 - +
  • [23] GA-based construction of fuzzy classifiers using information granules
    Department of Electrical and Electronic Engineering, Yonsei University, 134 Shinchon-dong, Seodaemoon-gu, Seoul 120-749, Korea, Republic of
    不详
    不详
    不详
    不详
    不详
    不详
    不详
    不详
    Int. J. Control Autom. Syst., 2006, 2 (187-196):
  • [24] GA-based Model Updating for Existing Bridges
    Kim, J. C.
    Yoon, J.
    Shin, S.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 1976 - 1981
  • [25] GA-based construction of fuzzy classifiers using information granules
    Kim, DW
    Lee, HJ
    Park, JB
    Joo, YH
    INTERNATIONAL JOURNAL OF CONTROL AUTOMATION AND SYSTEMS, 2006, 4 (02) : 187 - 196
  • [26] GA-based optimal selection of PZMI features for face recognition
    Kanan, Hamidreza Rashidy
    Faez, Karim
    APPLIED MATHEMATICS AND COMPUTATION, 2008, 205 (02) : 706 - 715
  • [27] A GA-based Scheduling Algorithm on Parallel Machines with Heterogeneous Mounted Molds
    Lee, Yeong-Chyi
    Qi, Qing-Fu
    Hong, Tzung-Pei
    Chen, Chun-Hao
    2014 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING (GRC), 2014, : 147 - 150
  • [28] A Hybrid GA-based Scheduling Method for Static Segment in FlexRay Systems
    Ding, Shan
    Yin, Xiaona
    Xu, Hongming
    Zhang, Shi
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 1548 - +
  • [29] GA-based examination scheduling experience at Middle East Technical University
    Ergul, A.
    Lecture Notes in Computer Science, 1153
  • [30] GA-based Job Scheduling Strategies for Fault Tolerant Grid Systems
    Wu, Chao-Chin
    Lai, Kuan-Chou
    Sun, Ren-Yi
    2008 IEEE ASIA-PACIFIC SERVICES COMPUTING CONFERENCE, VOLS 1-3, PROCEEDINGS, 2008, : 27 - +