GA-based multicriteria optimal model for construction scheduling

被引:165
|
作者
Leu, SS [1 ]
Yang, CH [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Constr Engn, Taipei 10672, Taiwan
关键词
D O I
10.1061/(ASCE)0733-9364(1999)125:6(420)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Resources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria computational optimal scheduling model, which integrates the time/cost trade-off model, resource-limited model, and resource leveling model, is proposed. A searching technique using genetic algorithms (GAs) is adopted in the model. Furthermore, the nondominated solutions are found by the multiple attribute decision-making method, technique for order preference by similarity to ideal solution. The model can effectively provide the optimal combination of construction durations, resource amounts, minimum direct project costs, and minimum project duration under the constraint of Limited resources.
引用
收藏
页码:420 / 427
页数:8
相关论文
共 50 条
  • [1] GA-based multi-objective optimization of finance-based construction project scheduling
    Fathi, Habib
    Afshar, Abbas
    KSCE JOURNAL OF CIVIL ENGINEERING, 2010, 14 (05) : 627 - 638
  • [2] GA-based multi-objective optimization of finance-based construction project scheduling
    Habib Fathi
    Abbas Afshar
    KSCE Journal of Civil Engineering, 2010, 14 : 627 - 638
  • [3] A GA-based heuristic approach for offshore structure construction spatial scheduling under uncertainty
    Dai, Lei
    Hu, Hao
    Chen, Feier
    SHIPS AND OFFSHORE STRUCTURES, 2015, 10 (06) : 660 - 668
  • [4] GA-Based Optimal PIDA Controller Design
    Sornmuang, Sunisa
    Sujitjorn, Sarawut
    NEW ASPECTS OF SYSTEMS THEORY AND SCIENTIFIC COMPUTATION, 2010, : 192 - +
  • [5] A GA-based optimal image watermarking technique
    Zhong Ning
    Kuang Jing-ming
    He Zun-wen
    2007 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT INFORMATION HIDING AND MULTIMEDIA SIGNAL PROCESSING, VOL 1, PROCEEDINGS, 2007, : 291 - 294
  • [6] GA-Based Optimal Allocation of Sensor Resources
    Chen, Jin-xia
    Chen, De-feng
    Wang, Yan
    2013 IEEE INTERNATIONAL CONFERENCE ON MICROWAVE TECHNOLOGY & COMPUTATIONAL ELECTROMAGNETICS (ICMTCE), 2013, : 395 - 397
  • [7] A GA-based approach for solving fuzzy project scheduling
    Liu, Yan
    Zhao, Sheng-Li
    Zhang, Xi-Ping
    Du, Guang-Qian
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3153 - +
  • [8] An effective GA-based scheduling algorithm for FlexRay systems
    Ding, Shan
    Tomiyama, Hiroyuki
    Takada, Hiroaki
    IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2008, E91D (08) : 2115 - 2123
  • [9] A Job Shop Scheduling Game with GA-based Evaluation
    Woo, Kim Jun
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2014, 8 (05): : 2627 - 2634
  • [10] Ga-based resource leveling optimization for construction project
    Zhao, Sheng-Li
    Liu, Yan
    Zhao, Hong-Mei
    Zhou, Ri-Lin
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2363 - +