An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs

被引:30
作者
Gajpal, Yuvraj
Rajendran, Chandrasekharan [1 ]
Ziegler, Hans
机构
[1] Indian Inst Technol, Dept Management Studies, Madras 600036, Tamil Nadu, India
[2] Univ Passau, Dept Operat Prod & Logist Management, Fac Business Adm & Econ, D-94032 Passau, Germany
关键词
D O I
10.1007/s00170-005-0093-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of scheduling in flowshops with sequence-dependent setup times of jobs is considered and solved by making use of ant colony optimization (ACO) algorithms. ACO is an algorithmic approach, inspired by the foraging behavior of real ants, that can be applied to the solution of combinatorial optimization problems. A new ant colony algorithm has been developed in this paper to solve the flowshop scheduling problem with the consideration of sequence-dependent setup times of jobs. The objective is to minimize the makespan. Artificial ants are used to construct solutions for flowshop scheduling problems, and the solutions are subsequently improved by a local search procedure. An existing ant colony algorithm and the proposed ant colony algorithm were compared with two existing heuristics. It was found after extensive computational investigation that the proposed ant colony algorithm gives promising and better results, as compared to those solutions given by the existing ant colony algorithm and the existing heuristics, for the flowshop scheduling problem under study.
引用
收藏
页码:416 / 424
页数:9
相关论文
共 33 条
  • [1] A review of scheduling research involving setup considerations
    Allahverdi, A
    Gupta, JND
    Aldowaisan, T
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02): : 219 - 239
  • [2] [Anonymous], 1992, OPTIMIZATION LEARNIN
  • [3] A tabu search approach for the flow shop scheduling problem
    Ben-Daya, M
    Al-Fawzan, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) : 88 - 95
  • [4] CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
  • [5] 2 MACHINE FLOW SHOP SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES - DYNAMIC-PROGRAMMING APPROACH
    CORWIN, BD
    ESOGBUE, AO
    [J]. NAVAL RESEARCH LOGISTICS, 1974, 21 (03) : 515 - 524
  • [6] DAS SR, 1995, J OPER RES SOC, V46, P1365, DOI 10.2307/2584570
  • [7] Ant system: Optimization by a colony of cooperating agents
    Dorigo, M
    Maniezzo, V
    Colorni, A
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 1996, 26 (01): : 29 - 41
  • [8] Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
  • [9] 4 SIMPLE HEURISTICS FOR SCHEDULING A FLOW-SHOP
    GELDERS, LF
    SAMBANDAM, N
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (03) : 221 - 231
  • [10] FLOWSHOP SEQUENCING WITH MEAN FLOWTIME OBJECTIVE
    HO, JC
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (03) : 571 - 578